Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Consider a 2D triangular element with the three vertices at 1[1,1], 2[1,2] and 3[2,2]. the displacements at these t hree points are [0.1,0.1], [0.3,0.2] and [0.4, 0.3] mm for point 1,2,and 3 respectively
1. determine the linear interpolation function of the displacement
2. calculate the interpolated displacement at [1.2, 1.4] and [1.5, 1.8] respectively
The wastewater treatment plant for Pine City discharges 1 × 105 m3/day of treated waste to the Pine River. Immediately upstream of the treatment plant, the Pine River has an ultimate CBOD of 2 mg/L and a flow of 9 × 105 m3/day.
A u-tube manometer is used to measure the pressure of a vessel under vacuum. Assume the manometer is open to atmospheric pressure (101.325 kPa) and the density of the fluid in the manometer is 12.0 g/cm3.
Long Line: the slope distance and zenith angle measured from point a to point b were 17,685.20 ftand 93degrees 13' 46" . The instrument and reflector heights were equal. If the elevation of the point A is 1854.43 ft above the MSL Datum
Draw the influence line for the support reaction at A and calculate the support reaction at point
A steel pipe carries an industrial oil under pressure. The steel pipe inside diameter is 36 in, the pressure head on the fluid is 383.0 ft. A)- Find the internal fluid pressure in psi
A chemical is added at the beginning of a water treatment plant at a dose of 750 lb/day. The water treatment plant provides water to a community of 200,000 people and the average water consumption in the city is 110 gallons per capita per day (gpc..
A tub of a washing machine is rotating at 50 rad/s when the power is turned off. If it takes 15s for the tub to come to rest, determine (a) the constant angular deceleration, and (b) the total number of revolutions the tub makes.
As a highway patrol officer, you are patricipating in a speed trap. A car passes your patrol car which you clock at 55 mph. One and a half minutes later, your partner in another patrol car situated two miles away from you, clocks the same car at 5..
Write a MATLAB program that loads the sensor_new.dat file. The sensor readings were actually taken every second over a period from 0 to 19 seconds. Create a time vector going from 0 to 19 in 1 second increments.
Determine D10, D30, and D60Effective grain size c. Cu d. Cz Sieve Number Opening (mm) Mass of soil retained (g) No. 4 4.750 28 No. 10 2.000 42 No. 20 0.850 48 No. 40 0.425 128 No. 60 0.250 221 No. 100 0.150 86 No. 200 0.075 40 Pan 24
A water treatment llant and the water treatment plant removes calcium hardness (Ca2+) by precipitating (making) CaCO3(s). If, after establishing equilibrium with CaCO3(s), the dissolved Ca2+ concentration is 10 mg/L and the pH is 10.5.
Also calculate the deflection of the beam to check that it complies with the design limit of L/200. Only variable actions are required for deflection check.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd