Determine the approximate dimensions of each carbon

Assignment Help Civil Engineering
Reference no: EM13535657

A two-bed carbon adsorption system is to be designed to handle 8000 acfm of air containing 700 ppm of hexane. Laboratory studies indicate that carbon can adsorb 8lb hexane per 100 lb carbon under the conditions at which the system will be operated. If the system is to operate at 90 F and 1.0 atm at a removal efficiency of 99%, determine the approximate dimensions of each carbon bed. Bed regeneration and cooling will require one hour.

Assuming a rectangular bed 2w - L 2w^2=A

How work this problem?

Reference no: EM13535657

Questions Cloud

Determine the velocity of the contact point in contact : Pinion gear A rolls on the fixed gear rack B with an angular velocity = 8 rad/s. Determine the velocity of the gear rack c . Assume the direction to the right as positive.
Calculate the length and diameter of the reaction zone : Calculate the length and diameter of the reaction zone of an afterburner that treats 2000 acfm of polluted air (measured at 250 F). The gases in the afterburner are at a temperature of 1400 F for a residence time of 0.50 sec. Assume the burner will b..
If you make decision by maximizing the expected : A manufacturing firm is considering two mutually exclusive projects. Both projects have an economic service life of one year, with no salvage value. The first cost of Project 1 is $1000 and the first cost of project 2 is $800. The Net year for each p..
What is the minimum required annual saveings in labor from : If the service life is just five years, instead of six years, what is the minimum required annual savings in lavore for the firm to realize a 10% return on investment?
Determine the approximate dimensions of each carbon : A two-bed carbon adsorption system is to be designed to handle 8000 acfm of air containing 700 ppm of hexane. Laboratory studies indicate that carbon can adsorb 8lb hexane per 100 lb carbon under the conditions at which the system will be operated.
How much natural gas is needed to incinerate this gas : The preheaded waste gas stream of 4,000 ACFM is entering a thermal oxidizer. The waste gas stream temperature is 1000 F. How much natural gas is needed to incinerate this gas stream at a temperature of 1500F?
Solve by using the quadratic formula : Solve by using the quadratic formula.  5x2 – 4x + 1 = 0
Draw a graph of the feasible region : Carla's Coffee Company mixes two blends of coffee.  Blend 1 is made by mixing 4 scoops of Arabica beans and 8 scoops of Brazilian beans.  Blend 2 uses 10 scoops of Arabica beans and 6 scoops of Brazilian beans.
Find the number of miles in each route : Carol sells two types of PC monitors.  She sold a total of 14 monitors last month.  One model sells for $280 and the other sells for $435.  If the total sales for the 14 monitors was $5,160, determine the number of each type of monitor she sold.

Reviews

Write a Review

Civil Engineering Questions & Answers

  What is the level of service on a km long percent upgrade

A rural freeway has an ideal free-flow speed of 120 km/h and two 3.6 m lanes in each direction, with right shoulder lateral clearance of 1.2 m. Interchanges are spaced approximately 5 km apart. Traffic consists of 10 percent trucks and buses and 8..

  Determine the torque needed to turn the impeller

A centrifugal pump is used to pump water from ariver. The absolute velocity V2 = 82ft/s is at an angle of 25 degrees to theradial direction. The impeller's thickness is of 1.2 in and r2= 0.86 ft and rotates at a speed of 1250 rpm.

  How to compute the elevation of points at stations

Tabulate station elevations for a 200-ft equal-tangent parabolic curve with g1= -1.25%, g2= +1.25%, VPI station = 146+00, and VPI elevation = 1,895.00 ft. Compute values if stakeout is at 30-ft increments. Check by second differences

  Find how much existing highway must be reconstructed

The overpass structure is to be level, centered 26 feet above the railroad, and 180 feet long. How much existing highway (in feet) must be reconstructed to provide appropriate vertical alignment

  Estimate the velocity with which would contact the ground

estimate the velocity with which you would contact the ground if you jumped from an airplane at an altitude of 500ft and a) air resistance is negligible, b) air resistance is important, but you forgot your parachute

  What is the probability that the second explosion

Cities cover approximately 0.5% of the Earth's land area, which itself constitutes 29% of the total surface of the planet. What is the probability that the second explosion in part (b) occurs over a city? Assume an equally likely probability of im..

  Determine the rate of heat exchange between human and room

A human with a surface area of 2 m^2 and a surface temperature of 27 degrees celcius radiates into a large room (which acts as a black body), the surfaces of which are at 15 degrees celcius.

  Select a hydraulic pump size and a hydraulic cylinder size

Hydraulic cylinders with a stroke of 72 inches are available with bore sizes from 2 o 8 inches. Hydraulic piston pumps with an operating pressure range from 200 to 3000 psig are available with pumping capacities of 5, 10, and 15 gallons per minute..

  List some of the advantages and disadvantages of rectangular

List some of the advantages and disadvantages of rectangular primary sedimentation tanks over circular sedimentation tanks which must be considered prior to the selection

  How much error would there be in the volume calculation

Assume the actual water temperature for calibrating a 1/3 ft3 measure was 65 degrees F. If you had used a water temperature of 75 degrees F for your calibration, how much error would there be in your volume calculation (both in ft3 and as a percen..

  What is present worth of five years of cost of maintanance

you purchased an old machine at the beginning of this year.maintanance on this old machine will be 100$ at the end of this year but is expected to increase by $25 each year after. what is the present worth of five years of the cost of maintanance

  Determine heat removed in the cooling process in kj per min

atmospheric air at 1.01 bar 30 c and 60 percent relative humidity flows over a set of cooling coils at an inlet flow rate of 1500 m^3/min the liquid which condeness is removed from the system at 17 c

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd