please give the answer for the question correctly and in detail

A piston-cylinder device contains 3 ft3 of air at 60 psia and 150°F. Heat is transferred to the air in the amount of 40 Btu as the air expands isothermally. Determine the amount of boundary work done during this process.




Put your comment
 
Minimize


Ask Question & Get Answers from Experts
Browse some more (Civil Engineering) Materials
Water is flowing in a 6-cm diameter pipe at 20 m/s at 10?C. If the pipe enlarges to a diameter of 12-cm, calculate the reduced velocity. Also, calculate the mass flux rate a
A compressor in a refrigerator receives R-410a at 150 kPa, -40?C and brings it up to 600 kPa, using an actual specific work of 58.65 kJ/kg in adiabatic compression. Find the
A pump delivers 60 degrees F water at 2000 gpm through a vertical pipeline 300 ft high. Find the minimum horsepower input to the pump. Assume that atmospheric pressure exist
A grievance has been filed by the union at Dorben Co. regarding the final inspection station, in which the operator slightly lifts a 20 lb assembly, examines all sides, and, i
Determine the mass of the earth knowing that the mean radius of the moons orbit about the earth is 238.910mi and that the moon requires 27.32 days to complete one full revol
Precipitation station X was inoperative for part of a month during which a storm occurred. The respective storm at the three surrounding stations A,B and C were 98,80 and 11
Design a swap that will net a bank, acting as intermediary, 50 basis points per annum. Make the swap equally attractive to the two companies and ensure that all foreign exch
Under these conditions flow is expected to be turbulent, but for a clean air, very smooth enterance (with guided vanes) to the tube and no tube vibration, it may be possible