Determine shear stress at each wall and max shear stress

Assignment Help Civil Engineering
Reference no: EM13315714

The velocity distribution for the flow of oil (SAE 20W) at 150 degrees between two plates is given by y(y-4) mm/s, where y is measured in mm and the space between the plates is 4mm. Determine the shear stress at each wall and the maximum shear stress.

Reference no: EM13315714

Questions Cloud

What is the heaviest barbell : The box of a well-known breakfast cereal states that one ounce of the cereal contains 144 Calories (1 food Calorie = 4186 J). what is the heaviest barbell
Calculate the normal force n exerted by the side of the slot : The flat circular disk rotates about a vertical axis through O with a slowly increasing angular velocity. Prior to rotation, each of the 0.60-kg sliding blocks has the position x = 29 mm with no force in its attached spring.
What is the total hydraulic energy at the surface of water : The bottom of a rectangular flume is 5 m above reference level. The depth of the water in the flume is 3 m. The average velocity is 1.7 m/s. What is the total hydraulic energy at the surface of the water and at the bottom of the flume.
Find the energy lost when the connections are made : A 70 pF capacitor and a 280 pF capacitor are both charged to 3.6 kV. They are then disconnected from the voltage source and are connected together, Find the energy lost when the connections are made
Determine shear stress at each wall and max shear stress : The velocity distribution for the flow of oil (SAE 20W) at 150 degrees between two plates is given by y(y-4) mm/s, where y is measured in mm and the space between the plates is 4mm. Determine the shear stress at each wall and the maximum shear str..
Obtain the moment of inertia around the center of mass : two small charges with a mass of 1 gram each are connected by 2 cm long insulating rod of negligible mass. Obtain the moment of inertia around the center of mass
Determine the force exerted on th mass in direction of wire : a 150 kg mass is suspended by wires from two hooks. the lengths of the wires have been adjusted so that the wires are each 50º from horizontal. assume that the mass of the wires is negligible.
Will html5 replace them altogether : Is it a good thing to allow companies other than the manufacturer to extend your browser software?
What is the buoyant force exerted on it by the air : An empty storage tank has a volume of 140 ft3. What is the buoyant force exerted on it by the air

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the transmissivity through a confined aquifer

A 12-in well is drilled through a confined aquifer of average thickness 80 ft. Two observation wells located 50 and 120 ft away register a difference in drawdown of 10 ft. The steady-state pumping rate is 1000 gpm

  What are the legal ways of doing disposal in the valley

A tank with a volume of 5,000 gal contains salt solution at an initial concentration (C0*) of 70,000 mg/L, but the concentration in the tank (C) needs to be reduced to 500 mg/L. Two approaches are being considered

  Estimate the particle removal efficiency

How do you propose to do this at the above treatment plant and estimate the head loss both immediately after backwash and 10 hours later, if the same water is applied at a rate of 2 L/s.m 2 .

  Determine the angle of twist of end a with respect to b

The 800 mm diameter shaft is made of A-36 steel. If it is subjected to the uniform distributed torque of 5kN*m/m, determine the angle of twist of end A with respect to B.

  How to estimate the ultimate total settlement

The settlement analysis for a proposed structure indicates that 6cm of settlement will occur in 4 yr and that the ultimate total settlement will be about 25cm. estimate (a) the ultimate total settlement and ..

  State 5 reasons why adding things to a project charter late

State 5 reasons why adding things to a project charter late in the project execution could be a detriment to the project's objectives

  Determine what is the standard deviation in w given the fact

You arrive at your bus stop at some random point in the cycle, what is your expected wait time, w(t), to board a bus. Be sure to show your work or you will lose points. What is the standard deviation in w(t) given the fact that there is no bus wait..

  What is the moment of the tension force acting at a

using the principles to developed in chapter 3 on equilibrium, one can determine that the tension in cable AB is 143.4 N. Determine the moment about the x-axis of this tension force acting on point A.

  Develop equation that determines mass of finishing rods

When in use, a fishing rod can be approximated to act as a cantilevered beam. Assume that the force (P) is applied to the end of the beam by a fish while the fisherman rigidly holds the other end of the beam.

  Determine the required cross sectional area of the cables

A steel plate which is 1.5 m by 1.5 m and 30 mm thick is lifted by four cables attached to its corners that meet at a point that is 2 m above the plate. Determine the required cross sectional area of the cables

  Establishing a horizontal distance

A tape is calibrated and found to measure 100.04ft between the 0- and 100-ft marks. What measurements should be laid out to establish a horizontal distance of 682.25ft?

  Find discharge flowing over a rectangular sharp crested wire

Find the discharge flowing over a rectangular sharp crested wire, in GPM, which has a width of 9.9 feet and a discharge coefficient of 3.24, if the head above the crest is 1.74 feet.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd