Determine a discrete-time transfer function

Assignment Help Computer Engineering
Reference no: EM131449748

Problem 01

Any linear multistep method can be used as an associative operational substitution method. Use operational substitution to determine a discrete-time transfer function that approximates G(8) using the Adams-Schlumberger predictor as an operational substitution method. You may use a computer algebra package to help with the resulting algebra.

Problem 02

For the Adams-Schlumberger predictor, determine
(A) the order of accuracy,
(B) the error constant, and
(C) the open loop z-plane poles and zeroes of the integrator.

Problem 03
For the Adams-Schlumberger predictor,

(A) sketch the closed-loop z-plane trajectories when the Adams-Schlumberger is applied to the first-order test system with pole at A < 0;
(B) on the trajectory map, identify the principal and spurious roots; and
(C) Determine the two maximum values of T, one that guarantees accuracy and the other that guarantees stability- of the simulation.

Problem 04

Plot the stability region for the Adams-Schlumberger predictor. Discuss "good" and -bad" regions with regard to tuning, relative stability, and absolute stability.

Problem 05

Plot a step response for the system whose transfer function is G(s) using the Adams-Schlumberger predictor method. Use as large a time step T as possible while retaining stability and accuracy of the simulation.

Problem 06

For the Adams-Schlumberger corrector, determine
(A) the order of accuracy,
(B) the error constant, and
(C) the open loop z-plane poles and zeroes of the integrator.

Problem 07
Plot the stability region for the Adams-Schlumberger corrector. Discuss good" and "bad" regions with regard to tuning, relative stability, and absolute stability.

Problem 08
Simulate the system whose transfer function is G(s) using the Adams-Schlumberger predictor-corrector pair. You may correct as many times as you like. Estimate the size of the predictor corrector stability region. You may Plot the stability region, but this is not required.

Verified Expert

Solution is about modeling the control system using Adams – Schlumberger predictor and Adams – Schlumberger corrector. the tasks are to find Order of accuracy, Error constant, Open loop poles and zeros. Next is the stability analysis done using step response plot from MATLAB.Good Region are estimated to be Region in green and Bad Region are estimated to be Region in red. finally Large T for stability is founded and analyzed.

Reference no: EM131449748

What is relationship between size and complexity and testing

What is the relationship between Size and Complexity and Testing? Do you agree: Better Code Coverage means better quality?  Based on the article what are the techniques that c

Provide a brief historical summary on sox enactment

Provide a brief historical summary on SOX enactment. Identify and explain the key ethical components of the SOX. Assess the social responsibility implications regarding mandat

What do you think might happen if situation does not change

What do you think might happen if this situation doesn't change? Is downloading music or videos without paying any different ethically than shoplifting CDs or DVDs from a st

Make any dfa in jflap software and run for several inputs

Make any DFA in JFLAP software and run for several inputs. Take a screen shot and include in your assignment. Keep in mind that this assignment is meant to make you all get

Designing a secure online data store

CKDF140 PROJECT Designing a secure online data store -  Risk analysis: which consists of asset evaluations, threat modeling, and vulnerability analysis and Security requiremen

Problem based on berkeley-based unix system

Consider a system such as a Berkeley-based UNIX system, in which users have secondary group identities that remain fixed during their login sessions - What are the advantage

Can you devise a protocol where proof size

Can you devise a protocol where proof size, verification time, and digest size are all sublinear? You might need a sub-protocol that involves some amount of two-way communic

What major cpus were made during that time

What major CPU's were made during that time? What kind of software did these cpus ran on? What kind of performance did they had? What was the first AMD made? How was it differ

Reviews

len1449748

4/3/2017 8:36:27 AM

any simulation needed should be done in matlab. detailed solution with explanation and reasoning is required. Estimate the size of the predictor corrector stability region. You may Plot the stability region, but this is not required.

Write a Review

 
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd