Cost-minimizing quantity using production order model

Assignment Help Operation Management
Reference no: EM131133715

Montegut Manufacturing estimated cost-minimizing quantity using production order model to be 500 units. Production averages 100 units per day, while demand is 20 units per day. Holding costs are $3.00 per unit per year, and setup cost is $60.00.

(a) If the firm wishes to produce this item in economic batches, what is the demand for this item?

(b) How many orders should be placed per year?

(c) How many days should be between the orders (Assume 365 days per year)?

(d) What are the total costs?

Reference no: EM131133715

Questions Cloud

Use of donations by honoring donor intent : Over the years, the Red Cross has been guided in its use of donations by honoring donor intent. This policy helped the organization deal with a major ethical challenge after the terrorist attacks of September 11, 2001. The Red Cross received more tha..
Plastic liner for concrete highway projects calls : The specification for a plastic liner for concrete highway projects calls for a thickness of 6.0 mm ± 0.1 mm. The standard deviation of the process is estimated to be 0.02 mm. The process is known to operate at a mean thickness of 6.03 mm. What is th..
Social media in integrated marketing communications program : What is the role of social media in an Integrated Marketing Communications Program? How does social media best contribute in helping marketers achieve their communications objectives?
Describe the impact of international trade on your own life : Describe the impact of international trade on your own life, using the products that you own or have purchased in the recent past. Select two and compare and contrast the two transportation infrastructures. Maritime, Air, Land/Warehouse, and/or Commu..
Cost-minimizing quantity using production order model : Montegut Manufacturing estimated cost-minimizing quantity using production order model to be 500 units. Production averages 100 units per day, while demand is 20 units per day. Holding costs are $3.00 per unit per year, and setup cost is $60.00. If t..
What are the values of the three slack variables : For the linear program. Max 4A+1B s.t. 10A+2B≤30 3A+2B≤12 2A+2B≤10 A,B ≥0 a. write this problem in standard form. b. solve the problem using the graphical solution procedure. c. what are the values of the three slack variables at the optimal solution..
Each mine should be used to fill order at least total cost : DiggingDeep Mining company has to fill an order of 40 tons of iron ore and 18 tons of cooper ore. They operate two mines producing both ores. Mine 1 yields four tons of iron and one ton of copper and costs $3200 per day to operate, while mine II yiel..
Exist for managers in using OB concepts : What are some of the biggest challenges and opportunities that exist for managers in using OB concepts? Give specific examples. How can the study of OB help organizations work through these challenges successfully?
Difference between problem solving and decision making : Great insights into the difference between problem solving and decision making, as well as aspects of defining the problem! Interestingly, these terms are used interchangeably by many people. And, yes, you will see some definitions where problem solv..

Reviews

Write a Review

Operation Management Questions & Answers

  A firm has redesigned its production process

A firm has redesigned its production process so that it now takes 10 hours for a unit to be made. Using the old process, it took 15 hours to make a unit.

  Describe the method in which ge has grown the organization

Using the Ansoff matrix, describe the method in which GE has grown the organization? What were the drivers for growing in this manner? Which of the three types of corporate parent is GE? Support your answer by the characteristics of GE’s parenting st..

  Characteristics associated with effective project teams

What are some characteristics associated with effective project teams? Can the same be said for an effective couple, orchestra, or professional sports team? Why or why not?

  Prepare brief analysis of the vacation cruise industry

Prepare a brief analysis of the vacation cruise industry using Porters Five Force Analysis. Briefly discuss the nature and strength of each of the five competitive forces.

  Developing common set of ethical standards

How the United States and the international community are developing a common set of ethical standards and discuss some of the challenges faced by the two governing bodies. Make a recommendation on at least five fundamental guidelines that you believ..

  What profit can be anticipated with a demand

Eastman Publishing Company is considering publishing an electronic textbook on spreadsheet applications for business. Build a spreadsheet model to calculate the profit/loss for a given demand. What profit can be anticipated with a demand of 3500 copi..

  Evaluate the impact of your meeting

Evaluate the impact of your meeting and the launching of your TQ plan, including two (2) strengths and two (2) weaknesses of the plan.

  Formulate the linear programming problem

MSA Computer Corporation manufactures three models of computers: the Alpha4, Beta5, and the Delta6. The firm employs thirteen technicians working 160 hours each per month on its assembly line. Formulate the linear programming problem to maximize the ..

  Evaluating diversified company business lineup

What is meant by the term strategic fit? What are the advantages of pursuing strategic fit and matchups in choosing which industries to diversify into? What does the industry attractiveness test involve in evaluating a diversified company's business ..

  What is the fewest number of workstations required

Bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product and what is the fewest number of workstations that you need?

  BWB benefits from way they formulate their mission-vision

In what way BWB benefits from the way they formulate their mission and vision? Do these mission and vision also create problems for the company? What should BWB do to be sustainable in the long term?

  Compute the bulleted points below and assume ordering costs

you are the logistics manager for an electronics manufacturer hqd in the united states. a new upper management has come

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd