QUESTION 1

Civils measurement has a number of differences to measurement using building codes. Provide a report on the following issues:

a) Provide an explanation of the major differences between civil engineering projects and building projects.

b) In CESMM 3 locational information generally has more emphasis than in building codes of measurement. Comment on why you think this is the case.

c) CESMM 3 "General Principles" 2.5 seems to be a contradiction, on the one hand it requires detail but in conclusion it requires brevity. Comment on this statement and list other CESMM 3 requirements which demand further description and/or itemisation in order to fully define what is required.

QUESTION 2

Project Brief

From the attached drawings nos.CE/2/A, B and C, and specification below, which represent a mooring dolphin in a tidal harbour:

(a) Prepare a taking-off list

(b) Using CESMM 3 take off the following:

Concrete work, formwork, reinforcement, piling and ancillaries.

Specification:
Location - WestHarbour.
MHWS = mean high water spring (tide).
Mooring dolphin head to be in designed mix concrete, mix ST2.- See additional information document.

Only measure a sample of the steel reinforcing rods, namely rods reference D1, and D2 see reinforcement specification on additional information document .

Isolated steel piles to be Round hex Box Piles No.3 section,weighing105.71kg/m,327x 330 mm, girth 112 mm. Each pile to be supplied with a cast steel shoe weighing 80 kg. All raking piles to be set at 1/3 inclination.

Piles to be fabricated and supplied to the following lengths; all vertical piles 16.50 m, raker piles 4 @ 17.00 m and 2 @ 18.50 m.

Outsides of piles, with exception of bottom 2.00 m shall be sand-blasted and painted with two coats of coal tar before pitching. After driving to the required penetration the piles to befilledwithconcretegradeC2,afterconcreteiscuredpilestobecutoffattheindicated level.

Coal tar to be removed from all surfaces in contact with the concrete dolphin head. Two rows of 25 x 25 mm mild steel bonding stubs each 180 mm long to be welded on to each face at the tops of the piles to provide a key for the concrete, (these are not shown on the drawings).

One vertical pile to have a pile test with a maintained loading of 350 tonnes with various reactions.

Attachment:- Layout.rar

Reference no: EM131240209

Questions Cloud

Determine the average velocity through each of holes : Water flows into a sink as shown in Fig. P12.6 at a rate of 2 gallons per minute. Determine the average velocity through each of the three 0.4-in.-diameter overflow holes if the drain is closed and the water level in the sink remains constant.
Bandwidth of a telephone transmission facility : 1. Given an amplifier with an effective noise temperature of 10,000 K and a 10- MHz bandwidth, what thermal noise level, in dBW, may we expect at its output? 2. What is the channel capacity for a teleprinter channel with a 300- Hz bandwidth and a ..
Compute the gradient of the loss : Suppose that we are now interested in predicting a numeric rating for each movie review. We will use a non­linear predictor that takes a movie review x and returns σ(w ⋅ Φ(x)), where σ(z) = (1 + e-z)-1 is the logistic function that squashes a real ..
Compute pittman company''s break-even point in dollar sales : Compute pittman company's break-even point in dollar sales for next year assuming. Determine volume of sales at which net income would be equal regardless of whether pittman company sells through agents or employs its own sales force.
Civil engineering projects and building projects : Provide an explanation of the major differences between civil engineering projects and building projects - Prepare a taking-off list and CESMM 3 locational information generally has more emphasis than in building codes of measurement. Comment on why..
Determining the pseudocode and flowcharts : General knowledge suggests that pseudocode or flowcharts can include clear and obvious logic errors. Give your opinion as to whether you believe it is worth time and effort to include possible logic errors that may arise during the development of ..
Shortly after the introduction of the computer : Shortly after the introduction of the computer, someone said that two computers could undertake all the computing in the World. At that time the best computers were no more powerful than today's pocket calculators. The commentator assumed that com..
Which way is the water flowing : Water flows steadily from one location to another in the inclined pipe shown in Fig. P12.34. At one section, the static pressure is 8 psi. At the other section, the static pressure is 5 psi. Which way is the water flowing? Explain.
What selling price should you place on your home : What selling price should you place on your home? Explain using capital budgeting calculations. Assuming the market rate of interest is still 7.5%, what should be the price of this third home? Why?

Reviews

len1240209

10/12/2016 7:32:10 AM

Your work will be assessed by looking at the following issues: Generally [1] Main heading missing [2] Secondary heading missing [3] No indication of drawings used [4] No indication on work section measured [5] No page numbers [6] No “signposts” [7] Inadequate labelling [8] All work to be written in ink Dimensions [9] No indication of built-up dimensions (sidecasts) [10] No sidecast extensions shown [11] Incorrect mathematical formula [12] Use either decimals or mm, not both [13] Decimals should be written thus: (a) Sidecasts (3 places) 0.210,

len1240209

10/12/2016 7:31:34 AM

The total submission should not exceed 1,500 words. ? This word limit is plus or minus 10% ( this is a typical academic standard) and excludes contents page, reference list and any appendices ? Exceeding the word limit by more than 10% will lead to the deduction of marks ? The assignment must be submitted electronically ONLY through AUT Online and Turnitin on or before the above submission deadline. Turnitin will be used to check the originality of the report. ? All students should be aware on the School’s policy on plagiarism, collusion, late submission and special considerations. ? All submissions shall have a bibliography of references and sources used in the preparation of the project. Students must use AUT APA referencing system when citing literature sources. ? All submissions should have a cover sheet identifying the course, the date and the student’s name. ? All submissions should be in Times New Roman, Ariel or similar easy to read font, 12pt 1.5 spaced (excluding table of contents, tables, references list and appendices).

len1240209

10/12/2016 7:31:22 AM

hi, ill send much more notes plus podcasts lecture slides etc. read the entire questions and the crtirea for full marks . plus i need it within this Friday 1pm nz Auckland time. cheers Nooh.Students should work individually. Work that exceeds the word limit by more than 10% of the total will be penalised.The full report including Question 1 and Question 2 and as 1 document not exceeding 1500 words Your submission be WORD – PROCESSED or TYPED; Hand-written submissions are not acceptable, with the exception of the taking-off list, and measurement take-off. ? The assignment is to be submitted in report format and as such should have a formal structure and layout. It should be presented as a professional electronic document. ? The School Coursework Cover Sheet should be completed and included with your submission. ? Your measurement take off must be type written or hand written in ink, and submitted on dimension paper similar to that attached to the back of this document; all work submitted in any other format, will not be accepted. ? Students shall work individually.

Write a Review

Civil Engineering Questions & Answers

  Find the maximum allowable tensile force

A 4-cm- diameter rod of aluminum 7075-T6 is to subjected to an axial tensile force such that the factor of safety based on the yield stress on 1.75. Find the maximum allowable tensile force. The yield stress of the aluminum 7075-T6 is o-y= 500MPa.

  What is the maximum displacement of the fifth mode

Find the relationship between a and b in the following equation that satisfy the Heat equation - What is the maximum displacement of the string at t = L/5 for the fifth mode? Explain how you determined that.

  What is the value of side b

In a right triangle with the hypotenuse c = 10 and the angle A =50 degrees , what is the value of side b ?

  What is fc and d

5 1/8 in thick laminated timber 24ft long column to support a roof 16 kips and floor load 38kips will be applied at 13' 4" from base.

  Determine a composite scs runoff curve number for basin

determine a composite scs runoff curve number for a 600acre basin that is totally within soil group C. the land use is 40% contoured row crops in poor hydrologic condition. 60% native pasture in fair hydrologic condition.

  Calculate the support reactions for the beam

Calculate the support reactions for the beam - calculate the bending moments at A, B, C and D and plot the bending moment diagram.

  Determine the acceleration of the automobile immediately

A motorist is traveling on a curved section of highway of radius 2500ft at the speed of 60 mi/hr. the motorist suddenly applies the brakes, causing the automobile to slow down at a constant rate.

  How much does the student have to pay at the end of 3 years

The compound interest formula is F=P(1+i)n where F is the total amount due, P is the initial cost or amount of money, i is the interest rate, and n is the number of periods interest is computed. 1.A student purchases a $1400 laptop computer for sc..

  Determine the largest load p that can be supported

The mean annual precipitation for a certain 132 square mile watershed is 25 inches. Assume the 20 percent of the annual precipitation reaches the watershed outlet as stream flow. Determine the mean stream flow rate in ac-ft/yr, sfd/yr, and square met..

  Compute the cars stopping distance and time

at s=0 the driver applies the brakes hard enough to cause the car to skid. Assume that the car keeps sliding until it stops, and assume that throughout this process acceleration is a= -7.4556. compute the car's stopping distance and time.

  Calculate the axial strain and the transverse strain in the

A rigid rectangular shelf is suspended from a rigid ceiling by mean of four rods of diameter .505 inches. The two rods to the left L1 and L2, are made of steel

  What lift area would be required per year

The current landfill site covers 50 acres, including 5 acres needed for access roads and auxiliary facilities, and has completed one lift on the site of solid waste. If two more lifts are envisioned before closure, how long would it take to complete ..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd