Calculate the total number of hours spent on each work order

Assignment Help Other Engineering
Reference no: EM131018748

You work in a company that hire and pay workers on weekly basis. At the end of each week you have to provide the total number of hours those workers spent in order to pay them. You will be provided with one Excel file at the end of each week that contains two columns which you may use to extract the information needed.

You are asked to come up and use a formula that will calculate the total number of hours spent on each work order by calculating the difference between the actual start date column and actual end date column by a single click and drag.

Please note that work orders may not finish at the same day and AM and PM is another factor to pay attention to.

Reference no: EM131018748

Questions Cloud

Prepare an appropriate journal entry for transaction : Prepare journal entries, if needed, to reflect the dividend declaration, the date of record, and the date of payment - How much was net income for 20X7 and 20X8?
Initial leadership perspective and describes : Compose an essay (minimum 500-600 words) that summarizes your initial leadership perspective and describes the changes to your initial perspective that occurred after completing the questionnaire, interviews, and research.
What is the new market demand equation for coffee mugs : You read in the Friday newspaper that consumers have a linear demand for coffee mugs, wanting 50 coffee mugs at a price of $5/mug and 70 mugs at a price of $3/mug. What is the new market demand equation for coffee mugs
Advantages and disadvantages of developing new sales : What are the advantages and disadvantages of developing a New sales organization for the Western Region that would organize according to these customer types:
Calculate the total number of hours spent on each work order : You work in a company that hire and pay workers on weekly basis. At the end of each week you have to provide the total number of hours those workers spent in order to pay them. You will be provided with one Excel file at the end of each week that ..
Prepare the aggregate plan and compute its total cost : Regular output rate for periods 1,2, and 3 are 300; 0 for period 4; and 450 for the last 2 periods. Note, though, that the forecast of 400 units in period 4 must be dealt with. Prepare the aggregate plan, and compute its total cost.
Combination of overtime and subcontracting : Suppose you can use a combination of overtime and subcontracting, but you cannot use subcontracting in more than two periods, there is 6 periods. Up to 50 units of subcontracting and either 0 and 40 units of overtime are allowed per period.
How is a credit contract set up : How is a credit contract set up? What are the requirements? What statutes affect the credit contract? How are the pros and cons of contractual obligations?
Legal argument with the customer : The customer is threatening to take action. You do not really want to be involved in a legal argument with the customer. How can this be solved.

Reviews

Write a Review

Other Engineering Questions & Answers

  Environmental engineeringquestion 1 analysis of the

environmental engineeringquestion 1 analysis of the movement of a tracer in a contaminated aquifer indicates that the

  Mobile applications require high availability because end

1.assess the effectiveness and efficiency mobile-based applications provide to capture geolocation data and customer

  Design a mine ventilation network

Draw in a decline from the surface (at -100) with nodes placed at every sub level to allow the break-offs to be established. Two ways are recommended to draw horizontal airways between levels.

  Calculate the molar composition of gas

Calculate the molar composition of this gas on both a wet and a dry basis and the ratio (mol H2O/mol dry gas).

  Temperature end of expansion process

A four-cylinder, four-stroke, 2.2-L gasoline engine operates on the Otto cycle with a compression ratio of 10. The air is at 100 kPa and 60°C at the beginning of the compression process, and the maximum pressure in the cycle is 8 MPa. The compress..

  Proposal for building prototype of voip to pstn converter

Research Proposal For Building Prototype Of VoIP To PSTN Convertor

  Calculate the marginal cost and the marginal revenue

Calculate the marginal cost and the marginal revenue for the product x2. Hint) Use the coefficients of x2 in constraints and dual prices and Formulate this problem as a linear program.

  Acceleration due to gravity

(c) His weight in Newton's. If the man is on the moon, where the acceleration due to gravity is gm = 5.30 ft/s2, determine

  Basic environment project plan development

The company's project proposes to increase the current ten terabyte data by twenty per cent annually. It also describes the relationship and integration between systems and infrastructure. Database and Data Warehousing, Analytics, Interfaces and C..

  Determining the average velocity in the pipe

Water at 20°C is pumped at 1500 gal/min from the lower to the upper reservoir, as in Fig. P3.141. Pipe friction losses are approximated by hf ˜ 27V2 /(2g), where V is the average velocity in the pipe.

  Determining the lower energy cost

The unit costs of electricity and natural gas are $0.092/kWh and $1.42/therm (1 therm = 105,500 kJ). Determine which system will have a lower energy cost.

  Discuss discrete and analog i-o points

Compare and contrast DCS, PLC, and SCADA systems, define PLC, DCS, and SCADA and discuss discrete and analog I/O points

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd