Calculate maximize profit

Assignment Help Managerial Economics
Reference no: EM1372198

The Zinger Corporation manufactures and sells a line of sewing machines. Demand per period (Q) for a particular model is given through the following relationship:
Q = 200 .5P
where P is price. Total costs (including a "normal" return to the owners) of producing Q units per period are:
TC = 20,000 + 50Q + 3Q2
(a) Express total profits (pie) in terms of Q. This should be an equation.

(b) At what level of output are total profits maximized? What price will be charged? What are total profits at this output level?

 

Reference no: EM1372198

Questions Cloud

What are likely consequences for future economic growth : Currently AIDS is spreading in china and India. Govt. of these nations fail to stop spread of AIDS what are likely consequences for future economic growth in china and India.
Food production-environmental impact : Examine the obvious environmental impacts as well as significant social and physical ramifications of urban sprawl. What is the relationship between landscape and psychological well being?
Main attributes of product in plug-ins change process : What are some main attributes of product and how may it help operations of organization? How do third-party plug-ins change process of diagnosing and troubleshooting errors in application?
What about marginal cost of subsequent doses : Using information given: What is average cost of first do these of a new drug. What about marginal cost of subsequent doses? Is this consistent with behaviour of costs for an information product.
Calculate maximize profit : The Zinger Corporation manufactures and sells a line of sewing machines. Demand per period (Q) for a particular model is given through the following relationship:
Calculate four-firm c0ncentration ratios for two industries : Top four firms in Industry B have market shares of top four firms in Industry B have market shares of 15,12,8 and 4 percent, respectively. Calculate four-firm c0ncentration ratios for two industries. Which industry is more concentrated.
Determine total project completion time and critical path : determine total project completion time and critical path for installing electrical wiring and equipment in residential houses. In addition, determine ES, EF, LS, LF and slack for each activity.
Find the minimum value for avc : Assume that the manager of a company operating in competitive market has estimated the company's average variable cost function to be AVC=4000-5Q+0.002Q^2
What happens to price of a bond that pays a fixed percent : What happens to price of a bond that pays a fixed percent of face value every year when interest rates in economy increase.

Reviews

Write a Review

Managerial Economics Questions & Answers

  Linear programming problem

Linear programming is a mathematical technique used to determine the optimal solutions to certain specific problems.

  Demand, supply and the market equilibrium

The article study for the demand, supply and the market equilibrium has been discussed. The article that has been review was published on August 2012.

  Supply and demand in professional sports

Draw the individual cost curves on one graph: marginal cost, average total cost, average ?xed cost, and average variable cost. Place costs ($) on the y-axis and quantity (Q) on the x-axis.

  Explain whether the firm will make economic profit

Explain whether the firm will make economic profit, In the short run and In the long run.

  Determine the official measure of the deficit

Determine the official measure of the deficit

  Coordination of the activities of a business

The organization and coordination of the activities of a business in order to achieve defined objectives.

  What is the profit maximizing number of gizmo widgets

What is the profit maximizing number of Gizmo Widgets that should be introduced? Be sure to account for the fact that Gizmo Widgets displace other kinds of widgets. Again, be sure you provide a brief explanation of your approach/reasoning.

  Determine autocorrelation function of a rectangular pulse

Prepare the sketch the Fourier transform of a rectangular pulse of amplitude 10 V and width 0.1 second that is centered on the zero time axis. Determine the autocorrelation function of a rectangular pulse.

  Managerial economics assignment

Carry out an analysis from the standpoint of both EMV and expected utility to establish Jeremiah’s best course of action, including a consideration of his bidding strategy with regard to the auction.

  Prepare a marginal cost analysed income statement for 2014

Prepare a Marginal Cost Analysed Income Statement for 2014 from the above data to identify total and individual medical procedure contributions and profits.

  Prepare a marginal cost analysed income statement for 2014

Prepare a Marginal Cost Analysed Income Statement for 2014 from the above data to identify total and individual medical procedure contributions and profits.

  Solve managerial economics questions

MGMT 3306: Solve the assignment problems, 1. Please answer the assignment questions in this docx file and save once you’re satisfied. Assignment 3covers the lectures slides for Week 6.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd