Question 1

Assume that the following inventory problem fits the assumptions of the Basic Fixed-Order Quantity inventory model. If the annual demand is 12,000 units, the ordering cost is $6 per order, the holding cost is $2.50 per unit per year, which of the following is the optimal order quantity?

Select one:
a. 57,600
b. 240
c. 120.4
d. 60.56
e. None of the above
e. In case the supplier changes the design

Question 2

For this problem assume the Basic Fixed-Order Quantity inventory model fits this problem situation. Which of the following is the Total Cost (TC) of inventory given the annual demand of 35,000, setup cost of $40, a holding cost per unit per year of $2, an EOQ of 1,183 units, and a cost per unit of inventory of $20?

Select one:
a. About $1,023,456
b. About $702,366
c. About $700,002
d. Cannot be computed based on information above

Question 3

A Chic electric razor (R) is assembled from a motor assemble (MA) and a housing half (HH). The motor assembly is assembled from a housing half (HH) and a motor (MTR). The motor is assembled from a rotor (RTR) and a stator (STR). The following inventory information is provided:

645_Fixed-Order Quantity inventory model.png

If a gross requirement for 200 electric razors (R) exists in week 16 and the quantities given above are in stock (On Hand), what is the net requirement for R?

Select one:
a. 40
b. 60
c. 80
d. 120
e. None of the above

Question 4

Rather than try to adjust the master production schedule to change resource loads, it is more practical to control the flow at each bottleneck to bring capacities in line.

Select one:
a. True
b. False

Question 5

Using the Basic Fixed-Order Quantity inventory model Reorder Point formula, determine which of the following is the reorder point value given an average daily demand of 50 units and a lead-time of 10 days?

Select one:
a. 500
b. 150
c. 50
d. 5
e. None of the above

Question 6

Vance Armstrong is making his monthly order (every 30 days) for a supply of racing tires for the Sunshine Bicycle Shop. The order will take two days to arrive. Vance sells tires at an average rate of five per day (six days per week) with a standard deviation of demand of one per day. He desires to have stock of racing tires at a 98 percent service probability to satisfy his customers. He currently has 35 racing tires in inventory. How many should be ordered? From standard normal distribution table, z = 2.05

Question 7

Jill's Job Shop buys Widgets for use in its production system. Each year the company uses about 10,000 Widgets that cost $10 each. The parts are needed 52 weeks/year at a constant rate. Widgets are ordered whenever remaining quantity drops to the reorder level. Holding costs amount to 20% of item cost. Every time an order is placed for more Widgets, ordering cost is $150. Lead-time to receive an order is 4 weeks. Safety stock is set at 55 units. What are the reorder quantity and the reorder point? A particular raw material is available to a company at three different prices, depending on the size of the order:

487_Fixed-Order Quantity inventory model1.png

The cost to place an order is $40. Annual demand is 3,000 units. Holding (or carrying) cost is 25% of the material price. What is the economic order quantity to buy each time?

Format for Answer: The best order size is ___________ units at a cost of $____ per pound.

Question 8
The two basic categories of forecasting are qualitative and quantitative. Name some of each method and identify when you use these methods related to new products/new technology and existing products/current technology?

Question 9

Question text

Historical demand for a product is as follows:

504_Fixed-Order Quantity inventory model2.png

(a.) Using a simple four-month moving average, calculate a forecast for October.

(b.) Using single exponential smoothing with alpha=0.3 and a September forecast =70, calculate a forecast for October.

(c.) Using simple linear regression, calculate the trend line (Yt) for the historical data. The X-axis scale is: April = 1, May = 2, and so forth. Y-axis is Demand from above. Yt = a + bx =

(d.) Using the linear regression model above, what is a forecast for October?

Question 10

From the reading Decoding the DNA of the Toyota Production System, what are the components of the "DNA" that underpin TPS (and subsequently JIT and Lean)? 

Question 11

Choose one of the rules of constraint/bottleneck management listed below (as demonstrated in the storyline of The Goal) and briefly discuss the concept as related to the diagram of the layout of a dentist's office shown on the diagram here.

A) Do not balance capacity, balance the flow.
B) An hour lost at a bottleneck is an hour lost for the entire system.
C) Bottlenecks govern throughput and inventory in the system.

Reference no: EM13108196

Part of the executive board in an organization

Should the Hr team be part of the executive board in an organization? List reasons why or why not thy should be part of the organization What does the HR department contribute

Job enrichment-job rotation and role analysis

Three popular interventions for enhancing worker satisfaction are job enrichment, job rotation, and role analysis. What is the difference between each one, and when might you

Producing one unit of product

Boilermakers, Inc. produces 3 products: A, B, and C. The unit prices of product A, B, and C are $5, $50 and $200, respectively. Assume that these products can be sold in unl

Organizations that use acceptance as their strategy

Organizations that use acceptance as their strategy for every and all identified "risk of loss" might be able to conduct proactive security measures and might have an apatheti

A make or buy analysis

Develop a report for Figi Fabricating that will address the question of whether the company should continue to purchase the part from the supplier or begin to produce the pa

Estimate the output process

A manufacturing process consists of three sequential operations. At maximum capacity operation A can output 125 units per hour, Operation B can output 120 units per hour, and

Give the answer of muliple choice question

In order to be effective, solid waste engineers must be competent in all of the following areas EXCEPT, All of the following should be included in a request for a proposa

Evaluate basic organizational structure options of MNEs

Evaluate basic organizational structure options of MNE’s. What types of organizational structures do you have experience with? Were some more desirable than others? Explain wh

Reviews

Write a Review

 
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd