Work breakdown structure

Assignment Help Basic Computer Science
Reference no: EM131154781

Question:

Assignment: VoIP Part 1 (Work Breakdown Structure)

This assignment contains two (2) deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file.

Overview

As the project manager for an IT department, you have been assigned to manage the project of deploying a new VoIP phone system to the company's campus. The campus consists of three (3) different buildings, each with twenty to fifty (20 to 50) workstations. The project must be completed in ninety (90) calendar days starting on November 1.

Deliverable 1: Summary (MS Word or open source equivalent)

1. Write a one to two (1-2) page summary document in which you:

a. Summarize the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.).

b. Define a work breakdown structure and describe the methodology behind constructing one.

Deliverable 2: WBS (MS Project or open source equivalent)

2. Use Microsoft Project to create a WBS which:

a. Contains at least five (5) main tasks, one for each of the PMBOK® process areas.

b. Contains at least sixty (60) line items distributed in ten (10) or more work packages.

c. Contains Work Breakdown Structure Code for each task.

d. Presents a duration estimate for each task which results in a duration estimate for the project not to exceed the requirements described in the overview.

Deliverable one (1) of your assignment must follow these formatting requirements:

  • Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format.
  • Include a cover page containing the title of the assignment. The cover page and the reference page are not included in the required assignment page length.

The specific course learning outcomes associated with this assignment are:

  • Identify how project management improves the success of information technology projects.
  • Explain the relationship of the scope of a project to the work breakdown structure.
  • Use technology and information resources to research issues in IT project management.
  • Write clearly and concisely about issues in IT project management using proper writing mechanics and technical style conventions.

Reference no: EM131154781

Questions Cloud

Find the optimal global alignment between two sequences : Using Perl or Python programming languages, implement the Needleman-Wunsch algorithm to find the optimal global alignment between two sequences. The program should ask the user to input the two sequences first, then to choose from a list of scorin..
What is client-server technology : What is client-server technology? Mention the advantage of client-server technology. Mention the disadvantage of client-server technology.
What is your intended major : Discuss how your interest in the subject developed and describe any experience you have had in the field - such as volunteer work, internships and employment, participation in student organizations and activities.
What is topology : What is topology? Mention the different types of topology?
Work breakdown structure : This assignment contains two (2) deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file.
Write a word paper on managements report on internal control : Write a 1,050- to 1,400-word paper on the following: Management's Report on Internal Control Over Financial Reporting. The Independent Registered Public Accounting Firm's Report on Internal Control Over Financial Reporting.
Consider budget-schedule and resources : What do you need to consider before accepting or denying the vendor proposal? Explain. How would your decision affect the overall project? Consider budget, schedule, and resources.
What alternative recruitment methods could southwood use : What are the main reasons why a vacancy may occur in the organization? What are the advantages of using the Internet for recruitment? What alternative recruitment methods could Southwood use?
Network requirements based on the specific needs : Earlier, you identified network requirements based on the specific needs of your clients. Much of your network's effectiveness will depend on how you incorporate those requirements and address those client needs in your network design.

Reviews

Write a Review

Basic Computer Science Questions & Answers

  Compare with the corresponding flow graph for the direct fft

Can the IFFT flow graph be obtained from the one for the direct FFT

  Center of mass of the solid bounded

Find the center of mass of the solid bounded above by z=4 , on the sides by z=seq root of 25-x^2-y^2, and outside the cylinder x^2+y^2=16 . (density = seq root x^2 +y^2)

  Problem regarding the osi network

For this network design assignment, you are free to come up with a fictional mid sized company engaged in a dot-com business for which you will select the business focus.

  Describe the social implications of gaming

Within 500 words, describe the social implications of gaming. Besides entertainment, think of other aspect of our society that can be affected by gaming.

  What risks associated with adopting and implementing an erp

What costs are involved with implementing an ERP? [Describe the items that will cost money - not the actual dollar estimates].

  What is regex and how do we use it

Can anyone tell us how to add "Do Use" Assertions to Validate Arguments to a private Method?

  Disadvantages of fcfs scheduling algorithm

What are the disadvantages of FCFS scheduling algorithm as compared to shortest job first (SJF) scheduling?

  Abstain from picking a password taking into account

Abstain from picking a password taking into account individual data (name, surname, names of your companion or youngsters, date of conception, social protection number, phone number, a word in the lexicon, a word in the word reference spelled in reve..

  Describe the scope and analyze how to control the scope

Describe the scope and analyze how to control the scope

  Principle of a single -phase transformer

Explain the basic construction and working principle of a single -phase transformer.

  Ethical and cultural differences on a website

For this Critical Thinking assignment, you are a technical communications project manager for BCG working on the CSIC project. Read the following scenario and review the requirements for writing a proposal:

  Determine the peak output voltage for the bridge rectifier

Determine the peak output voltage for the bridge rectifier in Figure 1 shown. Assuming the practical model, what PIV rating is required for the diodes. The transformer is specified to have a 12 Vrms secondary voltage for the standard 120 V across ..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd