What size square conduit is needed to transport

Assignment Help Civil Engineering
Reference no: EM13211157

A 30mm pipe X 460mm rectangular duct carries air. What size square conduit is needed to transport 4m cube per sec of water at a distance of 45m and head loss of of 1.08m.

Reference no: EM13211157

Questions Cloud

Megan meier cyberbullying prevention act : Explain to what extent you agree or disagree with H.R 1996,"Megan Meier cyberbullying Prevention Act.
What is the empirical formula of aluminum oxide : {rm Al} reacts with 4.45 {rm g} of {rm O}_{2}, what is the empirical formula of aluminum oxide?
Explain write a series of equilibrium expressions : Write a series of equilibrium expressions, a mass balance and a charge balance representing the complete reaction of 0.01 M H4EDTA
What average force was exerted on the ball : After falling from rest from a height of 32 m, a 0.45 kg ball rebounds upward, reaching a height of 22 m. If the contact between ball and ground lasted 1.5 ms, what average force was exerted on the ball?
What size square conduit is needed to transport : A 30mm pipe X 460mm rectangular duct carries air. What size square conduit is needed to transport 4m cube per sec of water at a distance of 45m and head loss of of 1.08m.
Compute the vapor pressure of each component : Calculate the vapor pressure of each component, the total pressure, and the composition of the vapor phase when the mole fraction of Br2 is 0.050. Assume that the conditions of an ideal dilute solution are satisfied at this concentration.
What is the ph of the solution : What is the pH of the solution created by combining 0.90 mL of the 0.10 M NaOH(aq) with 8.00 mL of the 0.10 M HCl(aq)? with 8.00 mL of the 0.10 M HC2H3O2(aq)?
Calculate the deflection of the beam : Also calculate the deflection of the beam to check that it complies with the design limit of L/200. Only variable actions are required for deflection check.
Calculate the deflection of the beam to check : Also calculate the deflection of the beam to check that it complies with the design limit of L/200. Only variable actions are required for deflection check.

Reviews

Write a Review

Civil Engineering Questions & Answers

  What are the concentrations of cl- and br-

AGNO3 is added to a solution containing 0.001 mol Cl- amd 0.001 mol Br- per liter. What are the concentrations of Cl- and Br- remaining when AgCl just begins to precipitate?

  Depth of aggregate of wheel load over soil

A 2000-lb wheel load is to be supported by aggregate over soil with a maximum bearing pressure of 1000 lb/sqft. What depth of aggregate is needed if the angle theta is 40 degrees?

  What is the change in it internal energy

A gas is compressed at a constant pressure of 0.800 atm from 9.00L tp 2.00L. in the process, 400J of energy leave the gas by heat. (a) What is the work done on the gas? (b) What is the change in it internal energy?

  Force required to hold the pipe

A 0.3-m diameter pipeline terminates in a nozzle of outlet diameter = 0.15 m. When water flows through this pipe at a rate of 0.25 m3/s, the force required to hold the pipe (N) is most nearly.

  Hypothetical velocity distribution in a horizontal channel

The hypothetical velocity distribution in a horizontal, rectangular open channel is V=0.3y (m/s), where V is the velocity at a distance y (m) from the bottom of the channel. If the vertical depth of flow is 2 m and the width of the channel is 4 m,..

  Finding the gallons of mercury

How many gallons of mercury (sg=13.54) would weight the same as 5 gallons of castor oil which has a specific weight of 56.69 pcf?

  Create a primary function

create a primary function that uses a function handle with a nested function to compute the ninimum of the function 20x^2-200x+12 over the range 0

  Determine the flow rate of the oil

Oil of a specific gravity of 0.75 is flowing through a 6-in pipe under a pressure of 15 psi. If the total energy relative to the datumplate is 8.0 ft below the center of the pipe is 58.6 ft, determine the flow rate of the oil.

  Sketch a streamline pathline and streakline

Sketch a streamline, pathline, and streakline, For a given flow the velocity from time t=0 to t=5s was u=2 m/s, v=0. Then from t=5s to t=10s the velocity was u=+3 m/s, v=-4 m/s. A dye streak was started at t=0

  Qualitative or quantitative risk assessment on the project

Conduct either a qualitative or quantitative risk assessment on this project. Identify the risk factors that you consider most important for the suspension bridge construction. How would you assess the riskiness of the project? Why?

  Calculate the relative compaction

A dam project specifies 97% compaction. Lab tests on the soil being used indicate that it has a maximum dry density of 1900 kg/m3 at an optimum water content of 13.2%. Field tests give the following results: Field dry density is 1790 kg/m3 and 16...

  Evaluate the pressure head at point

Evaluate the pressure head at point a and determine the vertical effective stress at point b and evaluate the lateral pressurein the brown clay

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd