Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A 30mm pipe X 460mm rectangular duct carries air. What size square conduit is needed to transport 4m cube per sec of water at a distance of 45m and head loss of of 1.08m.
AGNO3 is added to a solution containing 0.001 mol Cl- amd 0.001 mol Br- per liter. What are the concentrations of Cl- and Br- remaining when AgCl just begins to precipitate?
A 2000-lb wheel load is to be supported by aggregate over soil with a maximum bearing pressure of 1000 lb/sqft. What depth of aggregate is needed if the angle theta is 40 degrees?
A gas is compressed at a constant pressure of 0.800 atm from 9.00L tp 2.00L. in the process, 400J of energy leave the gas by heat. (a) What is the work done on the gas? (b) What is the change in it internal energy?
A 0.3-m diameter pipeline terminates in a nozzle of outlet diameter = 0.15 m. When water flows through this pipe at a rate of 0.25 m3/s, the force required to hold the pipe (N) is most nearly.
The hypothetical velocity distribution in a horizontal, rectangular open channel is V=0.3y (m/s), where V is the velocity at a distance y (m) from the bottom of the channel. If the vertical depth of flow is 2 m and the width of the channel is 4 m,..
How many gallons of mercury (sg=13.54) would weight the same as 5 gallons of castor oil which has a specific weight of 56.69 pcf?
create a primary function that uses a function handle with a nested function to compute the ninimum of the function 20x^2-200x+12 over the range 0
Oil of a specific gravity of 0.75 is flowing through a 6-in pipe under a pressure of 15 psi. If the total energy relative to the datumplate is 8.0 ft below the center of the pipe is 58.6 ft, determine the flow rate of the oil.
Sketch a streamline, pathline, and streakline, For a given flow the velocity from time t=0 to t=5s was u=2 m/s, v=0. Then from t=5s to t=10s the velocity was u=+3 m/s, v=-4 m/s. A dye streak was started at t=0
Conduct either a qualitative or quantitative risk assessment on this project. Identify the risk factors that you consider most important for the suspension bridge construction. How would you assess the riskiness of the project? Why?
A dam project specifies 97% compaction. Lab tests on the soil being used indicate that it has a maximum dry density of 1900 kg/m3 at an optimum water content of 13.2%. Field tests give the following results: Field dry density is 1790 kg/m3 and 16...
Evaluate the pressure head at point a and determine the vertical effective stress at point b and evaluate the lateral pressurein the brown clay
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd