What range of reactor volumes is necessary to achieve time

Assignment Help Civil Engineering
Reference no: EM13317684

to achive a specific level of disinfection a water treatment plant operator determines the" Ct" value 180mg min/l is necessary with units for disinfectant concentration C in mg/l and disinfectant contact time t in minutes. if the operation can very disinfectant concentration between 2-15mg/l, what range of reactor volumes is necessary to achieve the desired contact times for plant of flow 0.4m^3/s?

Reference no: EM13317684

Questions Cloud

Economics is about trade-offs if more scarce resources are : Economics is about trade-offs. If more scarce resources are used to produce one thing, fewer will be available to produce others.” Evaluate this statement
What is the resulting current in the wire : A 34.7 m long aluminum wire at a temperature of 24.3 oC has a radius of 0.295 mm. what is the resulting current in the wire
Examined the statistics for our basketbal : Examined the statistics for our basketball team"s wins last year and found that, when the third team played more, the winning margin increased. If the coach played the third team more, we would win by a bigger margin.” Evaluate this statement.
What is the maximum possible torque on the dipole : Two small plastic spheres, one charged to 18nC and the other to ? 18nC , are connected by a 30-mm-long insulating rod. What is the maximum possible torque on the dipole
What range of reactor volumes is necessary to achieve time : to achive a specific level of disinfection a water treatment plant operator determines the" Ct" value 180mg min/l is necessary with units for disinfectant concentration C in mg/l and disinfectant contact time t in minutes
What is the wavelength for that second source of light : Yellow-green light(wavelength 550nm) passes through two closely spaced very narrow slits, what is the wavelength for that second source of light.
Determine the source and sink temperature : Carnot engine working between a source temperature of T2 and sink temperature of T1 has efficiency of 25%. if the sink temperature is reduced by 20 degrees Celsius the efficiency is increased to 30%. find the source and sink temperature
Find the tension in string and the acceleration of cylinder : Must show all work and calculations!!!! A primitive yo-yo is made by wrapping a string several times around a solid cylinder with m=200g and r=10cm. Find the tension in the string and the acceleration of the cylinder
Describe and explain why this process will be useful and how : Use the integrated strategic change intervention. Describe and explain why this process will be useful and how it can be implemented within VRD given the facts in the case

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine what is the speed of the ballast bag when it lands

A hot air balloon starting on the ground ascends at a rate of 12 km/hr and is carried by the wind (horizontally) at a rate of 20 kn/h. When the balloon reaches a height of 50 m, a ballast bag is dropped.

  Determine what is ph of the solution at equilibrium

Calcium sulfate (CaSO4, solubility product Ksp=2*10^-5 M^2), is added to initially pure water, such that solid CaSO4 remains at equilibrium. (Assume the sulfate does not participate in reaction other than the solubility product; no HSO4- formed).

  What is hydraulic residence time for activated sludge tank

A wastewater treatment plant uses an activated sludge process for secondary treatment of 0.300 cubic meters / second of primary effluent. The mixed liquor has a concentration of 2,100mg VSS/L, and the RAS concentration is 10,000mg VSS/L.

  Plot horizontal component of velocity and dynamic pressure

A wave has a height of 1.5 m in water 5 m deep and a wave period of 6 s. Plot the horizontal component of velocity, the vertical component of acceleration, and the dynamic pressure at a point 2 m below the still water level versus time for a 6-s i..

  Determine what is the maximum height the water can reach

A fireman reduces the exit area on a nozzle so that the velocity inside the hose is quite small relative to the exiting velocity. What is the maximum exiting velocity and what is the maximum height the water can reach

  Find the height and the width of the triangular soil bank

The soil's angle of repose is 35° and its swell is 25%. Find the height and the width of the triangular soil bank that will result from the trench excavation

  Determine the time needed for block a to rise 3 m

The moto draws in the cable at D with a constant acceleration of aD=8 m/s^2. If vD=0 when t=0, determine: a) the time needed for block A to rise 3 m b)the relative velocity of block A with respect to block B when this occurs.

  Develop an estimate of the volumetric flow rate of air

Develop an estimate of the volumetric flow rate of air that will be required for aeration of the mixed liquor in an activated sludge system.For this calculation, assume that the (ultimate) CBOD is 200 mg/L and (ultimate) NBOD is 50 mg/L.

  What type of exercise takes place in a classroom

What type of exercise takes place in a classroom setting arranged to look like an emergency operations center or in an actual emergency operations center, and involves simulation using written, telephone, and radio messaging.

  What is the change in it internal energy

A gas is compressed at a constant pressure of 0.800 atm from 9.00L tp 2.00L. in the process, 400J of energy leave the gas by heat. (a) What is the work done on the gas? (b) What is the change in it internal energy?

  Determine the values of stress and the change in thickness

A rectangular steel plate with thickness t=0.625 inches is subjected to normal stresses sigma x and sigma y.The strain in the x direction is known to be 0.00065 and the strain in the y direction is known to be 0.0004.

  Find how many assemblies the inspector may inspect per min

A grievance has been filed by the union at Dorben Co. regarding the final inspection station, in which the operator slightly lifts a 20 lb assembly, examines all sides, and, if acceptable, sets it back down on the conveyor, where the assembly goes..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd