What is the productivity

Assignment Help Operation Management
Reference no: EM13228376

A local market research firm has just won a contract for several thousand small projects involving data gathering and statistical analysis. In the past, the firm has assigned each project to a single member of its highly-trained professional staff. This person would both gather and analyze the data. Using this approach, an experienced person can complete an average of 10 such projects in an eight-hour day. The firm's management is thinking of assigning two people to each project in order to allow them to specialize and become more efficient. The process would require the data gatherer to fill out a matrix on the computer, check it, and transmit it to the statistical analysis program for the analyst to complete. Data can be gathered on one project while the analysis is being completed on another, but the analysis must be complete before the statistical analysis program can accept the new data. After some practice, the new process can be completed with a standard time of 20 minutes for the data gathering and 30 minutes for the analysis. a. What is the production (output per hour) for each alternative? What is the productivity (output per labor hour)? b. How long would it take to complete 1,000 projects with each alternative? What is the labor content (total number of labor hours) for 1,000 projects for each alternative?

Reference no: EM13228376

Questions Cloud

Discuss the pros and cons of the major technologies used : Discuss the pros and cons of the major technologies used in: a. The knowledge creation and capture phase. b. The knowledge sharing and dissemination phase. c. The knowledge acquisition and application phase.
What is the allowable standard deviation in the temperature : what is the allowable standard deviation in the temperature of her oven in order o achieve a Six Sigma level of quality?
The most important figure in early christianity after jesus : The most important figure in early Christianity after Jesus
Why is it important for groups and teams to have a balance : Why is it important for groups and teams to have a balance of conformity and deviance and a moderate level of cohesiveness?
What is the productivity : What is the production (output per hour) for each alternative? What is the productivity (output per labor hour)? b. How long would it take to complete 1,000 projects with each alternative? What is the labor content (total number of labor hours) fo..
How many batteries are needed for the project : A student project is required to be portable and hand held. It requires 6 V DC power at a current of 150 mA. The batteries for the power supply must last for a minimum of 7 hours of continuous operation.
Expand the memory unit to a ram using two 7489ics : Expand the memory unit to a 32x4 RAM using two 7489ICs ( you might use the HM6116A120 chip for the Multisim Program Simualtion). Use the CS inputs to select between the two ICs. Note that since the data outputs are 3-stated
Internal element of compression flange : what do mean by outstand element of compression flange, internal element of compression flange and web general
Give the polar plot of the frequency response : 1. Sketch the polar plot of the frequency response for the following loop transfer functions: Gc(s)G(s) = 1 / ((1 + 0.25s)(1 + 3s)) Gc(s)G(s) = 5(s^2 + 1.4s + 1) / (s - 1)^2 Gc(s)G(s) = (s - 8) / (s^2 + 6s + 8) Gc(s)G(s) = 20(s + 8) / (s(s +2)(s + 2)..

Reviews

Write a Review

Operation Management Questions & Answers

  What determines the size of a process batch

suppose an operation has excess capacity (i.e., it is not a bottleneck) however the setup time between batches is not insignificant. Should process batches be large or small? What determines the size of a process batch?

  Decide whether the supply chain represents a low-cost

Decide whether the supply chain represents a low-cost, rapid response or differentiation strategy. Are the supply-chain characteristics significantly different from one product to another.

  Recommend to both the senior executives

Recommend to both the senior executives (i.e., the company) and John Compton (i.e., the president) whether the project management office (PMO) should report to the chief information officer (CIO) or to someone else. Justify the response.

  Illustrate what are risks also benefits of expanding disney

Illustrate what are risks also benefits of expanding Disney brand in new ways. Support your answers with a minimum of one source per question, no more than five years old.

  Find out machine downtime also operator cost

Find out machine downtime represents a cost of $70 per hour; operator cost (including salary and fringe benefits) is $15 per hour. Illustrate what is optimum number of operators.

  Illustrate what data management problems have arisen

Illustrate what data management problems have arisen. Elucidate how has MySpace solved or attempted to solve these problems.

  Calculate the average number of customers waiting at lhs

During busy periods, a new customer walks into LHS every 15 mins. (with a standard deviation of 15 mins). At SHC, a customer walks in every hour (with a standard deviation of 1 hour) LHS has a staff of 4 barbersm while SHC has 1 barber.

  Compute the percentage idle time for the assignment

Six tasks, with times and precedence requirements as shown in the following table, are to be assigned to workstations. The desired output is 160 units per 8 hour day.

  Discuss the problems posed by commercial piracy

Discuss the problems posed by commercial piracy. Explain how an international strategy would take this into account

  How is the optimal solution affected

Based on the original objective function, would you recommend that they accept the offer? d. Assuming that Sydneyville purchases the 50 square feet of maple, how is the optimal solution affected?

  What are the challenges associated with acquiring

What are the challenges associated with acquiring and deploying an ERP system? Cite any references you use at the end of the paper.

  What are some possible reference sources

worst-case and alternate scenarios require a plume projection to be developed showing the potential area impacted by a release. What are some possible reference sources (you) could use in determining the impacted areas and populations.

Free Assignment Quote