(Window Boxes) Metal window boxes are manufactured in two process steps: stamping and assembly. Each window box is made up of three pieces: a base (one part A) and two sides (two part Bs). The parts are fabricated by a single stamping machine that requires a setup time of 120 minutes whenever switching between the two part types. Once the machine is set up, the processing time for each part A is one minute while the processing time for each part B is only 30 seconds. Currently, the stamping machine rotates its production between one batch of 360 for part A and one batch of 720 for part B. Completed parts move from the stamping machine to the assembly only after the entire batch is complete. At assembly, parts are assembled manually to form the finished product. One base (part A) and two sides (two part Bs), as well as a number of small purchased components, are required for each unit of final product. Each product requires 27 minutes of labor time to assemble. There are currently 12 workers in assembly. There is sufficient demand to sell every box the system can make.
a. What is the capacity of the stamping machine?
b. What batch size would you recommend for the process?
Determine the importance of bankers having good working relationships with their clients. Support your response with two (2) examples that illustrate such importance.
How many observations would be needed to estimate the mean time for element 2 within 1 percent of its true value with a 95.5 percent confidence? How many observations would be needed to estimate the mean time for element 2 within .01 minute of its..
Recall that service operations can be classified as processing people, goods, or information. What challenges are faced in each category when globalization is undertaken?
Assembly of a model airplane has a learning curve of 80 percent. The estimated time to assemble a second identical model airplane is 40 hours. Determine approximately how much time will be required for:
Prepare a run diagram for this emergency call data. Use five minute intervals (i. e., count the calls received in each five minute interval. Use intervals of 0 4, 5 9, etc.). Two or more calls may occur in the same minute; there were three operat..
Throughout the strategic management text the discussion of creating a "Sustainable Competitive Advantage" becomes the main focus. But why is this all that critical? Further, how can organizations create a competitive advantage that can endure?
Supply Chain Management Performance Problem : You are given the following data relating to the value of inventory in your company: (All values are in thousands) Quarter 1 2 3 4 Cost of Goods Sold ($) 1100 1300 1100 1300 Aggregate Inventory ($) 280 32..
safety regulations require that the time between airplane takeoffs on the same runway will be at least 3 minutes. when
Air China is regularly selling out the cargo belly hold capacity on its scheduled Beijing to Los Angeles passenger flights. Air China is considering leasing a Boeing 747-400 freighter (originally a passenger aircraft, but converted to all- cargo) to ..
Introduce a new product or use one that is out n the market. I have to create a presentation introducing this new product utilizing the Quality function deployment model. I am looking to find one that is already done and i can modify to use for my p..
Place the following eight points onto the five forces model: Start up costs are very low. Students have access to books, videos, and paper-based distance learning packs. The more innovative learning sites give lesson for free just for the love of it..
behavioral heuristics such as availability anchoring vividness storage conjunction fallacy and representativeness all
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd