Complete the project plan you have been developing throughout this course.

Procedure
1.Using Chapter 4 in A Guide to the Project Management Body of Knowledge (text) as your resource, your Project Plan should include the following major topics: ?Project charter
?Scope statement
?Work breakdown structure (WBS)
?Schedule
?Cost estimates
?Project baseline
?Key or required staff
?Open issues and pending decisions
?Quality management summary and plan
?Other information needed for this project

2.Revise all components of your project plan based on the feedback you have received from your professor throughout the course. Add a summary of the changes you have made based on feedback to the end of your plan, and explain why some suggested changes were not made, if applicable.

Reference no: EM13711741

Questions Cloud

Ideal rankine cycle without feed water heating : Consider a power plant operating on an ideal Rankine cycle without feed water heating. Steam enters the turbine saturated at 1000F at the rate of 5 x10 lbm/H. The turbine exhausts to a surface condenser at 1 psia. The condenser has an overall heat tr..
Reciprocating compressor has been selected to compress : A reciprocating compressor has been selected to compress 0.085 m3/s of 25oC methane gas from 100 to 6200 kPa. Assuming that the heat capacity remains constant at 2433 J/(kg?K) over the temperature range of compression and that the ratio of C  p/C  v ..
Define scope with a work breakdown structure : Define Scope with a Work Breakdown Structure In the previous module, you began to plan for scope by developing a Project Charter and a Project Scope Statement. Now you will continue with Scope Planning by developing a work breakdown structure (W..
What is the mole fraction of propane in the fuel stream : A mixture of propane and butane is fed into a furnace where it is mixed with air. The furnace exhaust leaves the furnace at 343°C, 780.0 mmHg and contains only N2, O2, CO2, and H2O. The partial pressure of O2 in the exhaust is 51.40 mmHg and the part..
The project management body of knowledge : Revise all components of your project plan based on the feedback you have received from your professor throughout the course. Add a summary of the changes you have made based on feedback to the end of your plan, and explain why some suggested c..
The mole fraction of water vapor in air-the molal humidity : If the weather report says that it is 60°F outside, the barometric pressure is 28.50 in Hg, and the relative humidity is 85.0%, find the following values. The partial pressure of water. The mole fraction of water vapor in the air
Demonstrate about effect of poor project screening method : What does this case demonstrate about the effect of poor project screening methods on a firm's ability to manage projects effectively? How would project portfolio management help to improve the situation at Keflavik?
Write down the transfer function of a third-order system : Write down the transfer function of a third-order system with unity steady-state gain which has a real pole at s = -1 and a pair of complex poles at s = -1 +- ja. Simulate the open-loop step response of the system for 'a' values of 1, 2, 4, and 10, a..
Calculate the force on a wall subjected to a two-phase jet : Calculate the force on a wall subjected to a two-phase jet that has the following parameters:

Reviews

Write a Review

Business Management Questions & Answers

  Product safety standards-concept of negligence

Discuss the contractual standards to product safety. Explain the ethical manifestations associated with the contractual standard of product safety.

  Promote a collaborative culture in a company

Do you know of any tools that promote a collaborative culture in a company?

  Find out a confidence interval for the true mean lifetime

Find out a 90% confidence interval for the true mean lifetime of all light bulbs of this brand. Then complete the table below. Carry your intermediate computations to at least three decimal places. Round your answers to one decimal place.

  Kotters 8-step process for change describes characteristics

kotters 8-step process for change describes characteristics of transformational change and find reasons why

  1 show the role of people products and profits played in

1. show the role of people products and profits played in the decisions made regarding the ford pinto.2. show what if

  Achieving diversification

Diversification is achieved through two methods: through horizontal relationships, and through hierarchical relationships.

  Determine which of the subsequent would be more difficult

Determine which of the subsequent would be more difficult to execute correctly across the greatest number of projects: preparing cost estimates or preparing the cost volume. Elucidate your rationale.

  Change concepts intersect and crystelintersect investments

change concepts intersect and crystelintersect investments executives are pointing fingers because of internal

  Self-serviceas we all know self-service has become more and

self-serviceas we all know self-service has become more and more the norm. gasoline stations and buffets for example

  What effects does the internets capability

Illustrate what effects does the Internet's capability have on this brand also illustrate what should the owner of the brand do in light of them.

  Explain what opportunities present themselves to you

Explain what opportunities present themselves to you if this integration takes place? Explain what threats will you face if this occurs?

  Evaluative criteria female shoppers using buying electronics

Illustrate what are two or three objective evaluative criteria and subjective evaluative criteria female shoppers using when buying electronics?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd