Reference no: EM13921872
Donna Shader, manager of the Winter Park Hotel, is considering how to restructure the front desk to reach an optimum level of staff efficiency and guest service. At present, the hotel has five clerks on duty, each with a separate waiting line, during the peak check-in time of 3:00 pm. To 5:00 pm. Observation of arrivals during this time shows that an average of 80 guests arrive each hour (although there is no upward limit on the number that could arrive at any given time). It takes an average of 3.2 minutes for each frontdesk clerk to register each guest. Donna is considering three plans for improving guest service by reducing the length of time guests spend waiting in line.
The first proposal would designate one employee as a quick-service clerk for guests registering under corporate accounts, a market segment that fills about 30% of all occupied rooms. Because corporate guests are preregistered, their registration takes just 2 minutes. With these guests separated from the rest of the clientele, the average time for registering a typical guest would climb to 3.8 minutes. Under Plan 1, noncorporate guests would choose any of the remaining four lines.
The second plan is to implement a single-line system. All guests could form a single waiting line to be served by whichever of five clerks became available. This option would require sufficient lobby space for what could be a substantial queue. The third proposal involves using an automatic teller machine (ATM) for check-ins. This ATM would provide a service just slightly better than a clerk, 3.0 minutes. Given that initial use of this technology might be minimal, Shader estimates that 20% of customers, primarily frequent guests, would be willing to use the machines. (This might be a conservative estimate if the guests perceive direct benefits from using the ATM, as bank customers do. Citibank reports that some 95% of its Manhattan customers use its ATMs.)
Donna would set up a single queue for customers who prefer human check-in clerks.
This would be served by the five clerks, although Donna is hopeful that the machine will allow a reduction to four.
Discussion Questions
1. Determine the average amount of time that a guest spends checking in under the current mode of operation. How would this change under each of the stated options?
2. Which option do you recommend?
3. What other considerations or limitations should be considered/evaluated?
What are contracting costs
: What are contracting costs? Give a few examples of contracting costs. What effect does the existence of contracting costs have on market economies?
|
Explain process by which the banking system creates money
: Assume that the bank holds no excess reserves and that the required reserve ratio equals 10% of deposits. If a customer deposits $5,000, what would be the total increase in checking account balances throughout all banks? Explain the process by whi..
|
Prepare the journal entries to record issuing the bonds
: Prepare the journal entries to record issuing the bonds and any necessary journal entries for 2013 and 2014. Post the journal entries to T accounts.
|
Do you think the owners argument is correct and explain
: The inequity of players across teams would make the sport less interesting to fans and thus destroy the league. Do you think the owners' argument is correct? Explain.
|
Single queue for customers
: Donna would set up a single queue for customers who prefer human check-in clerks. This would be served by the five clerks, although Donna is hopeful that the machine will allow a reduction to four.
|
Compute net present value of the new mine
: Compute net present value of the new mine assuming a 15% after tax cost of capital. Should the mine be opened?
|
Do you think that the membership is more likely to vote
: Do you think that the membership is more likely to vote in favor of the proposal at Locust Hill or for the one at Salt Lake Country Club? Explain.
|
Brown manufacturing
: Brown Manufacturing is trying to determine the equivalent units for conversion costs with 5,000 units of ending work in process at 80% completion and 40,000 physical units that are 100% complete as to materials
|
How to create a legally binding contract
: The agreement will be for employees to sign who wish to further their education while working for your company. Be creative, yet professional. The following components must be present in your contract. For each element you must demonstrate your ..
|