Project management new house construction

Assignment Help Project Management
Reference no: EM13786414

PROJECT MANAGEMENT OPTION - NEW HOUSE CONSTRUCTION

INTRODUCTION

The quality management concept in any project is mainly used to ensure that the minimum required quality level of the particular product or service is achieved. In the construction industry, the quality management concept ensures that the quality of the construction processes and works is maintained and that it meets the minimum required standard so as to ensure customers satisfaction and that would enhance the overall competitive performance in the long-term (Tan, 2005).

PROCESS SELECTION

The project management selection of constructing and moving into a new house as well as selling the old house will be integral in expounding on the concept of quality management in construction projects.According to Harris (2001), quality management is critical in providing the necessary environment in which there would be an effective deployment of tools, techniques and procedures that would lead to a successful construction project. The quality management process involves continuous improvement and as such the major improvements I would make is to increase the size of the new house to 2400 sq. feet with stone exterior as compared to the existing house which is quite smaller at 1400 sq. feet with vinyl exterior. A strong emphasis in use of modern technology in terms of construction methods, materials, machines as well as skilled labor would enhance the quality of the new house construction project.

CUSTOMER ANALYSIS

The quality management process in any construction project involves both internal and external stakeholders. The main internal customers are mainly involved in ensuring that process of quality management is adhered during the whole construction process while external customers are the targeted recipients of quality products emanating from the construction process.
The main internal quality stakeholders involved in the construction project include; Architect/designer whose responsibility is in providing quality drawings and specifications meeting the owners requirements, Structural engineers whose responsibility responsible in provision of quality scientific knowledge that would solve any construction related problem during construction, General Contractor with the responsibility of overseeing the overall success of the entire project in terms of quality assurance, Field inspector whose responsible for reviewing the design criteria prior to the construction process and ensure compliance to proper quality codes in the area is adhered to, Material suppliers who are responsible for providing quality construction materials at each stage of the construction process, Specialty trade contractors who provide the necessary manpower during the construction process and ensure that the construction process they undertake adheres to the drawings and specifications.

QUALITY MANAGEMENT PROCESS

The quality management process involves planning and controlling the overall performance and execution of the project. This quality management process plays a vital role in the entire project management process which involves; ProjectInitiation, Project Planning, Project Execution, Project Monitoring and Control, and Closure.Quality management process in any construction activity is mainly aimed at ensuring that the product or process provided meet the specific quality specifications that are satisfactory and fiscally sound. The quality control team in the construction process is mainly tasked with identification of any product or process that does not meet the minimum standard of quality. If any quality control issue is identified the team may temporarily stop the construction process (Wise Geek)

Factors that influence the quality control process

a. Manpower

Human labor plays an integral part in the construction process and the overall quality coupled with the individual ability of the manpower used determines to a great extent the quality of all construction activities. According to Cheng Hu (2004) human labor is considered as part of the controlled target as well as controlling drive of the quality activities involved across the entire construction project management process. The main factors within the manpower that affects the overall quality of the construction process includes the individual's skills and knowledge, physical and psychological conditions, level of quality consciousness and professional ethics.

b. Machines & Equipment

The construction equipment and machinery plays an integral part in any construction process and has a direct impact of the overall progress and quality of the construction project. The quality control process ensures that the proper type and performance parameters of the equipment's and machinery used in the construction process should match the conditions present on the construction site as well as the construction technology utilized in the industry (Liang 2004).

The contractor should ensure that the construction equipment and machinery selected should have a reliable performance in terms of safety, production applicability to the specific construction project and should meet the minimum technological specifications current at that time. The equipment's performance characteristics should meet the minimum quality assurance requirements of the construction process. In addition to this, the construction equipment selected should be matched and adapted for use by the operational workers at the construction site.

c. Materials

In order to ensure and enhance the quality process, the type of materials, its conditioning and quality forms an integral part in the construction process. The main components of quality control in terms of material used include; procurement of the material, testing of the material and material storage/usage.

The contractor should ensure that the construction materials procured is based upon the following considerations; the engineering characteristics, scope of its application, the construction requirements and contracts, price and performance of the materials. Procurement of the material should be conducted in advance with regard to the construction schedule prepared at the planning stage.

The materials procured should also meet the minimum quality requirements as specified in the procurement contract. A sample of the materials to be obtained should be tested and compared with the quality standards present through sampling inspection. To avoid any quality issues brought about by material deterioration, proper storage facilities as well as usage should be established. The contractor should avoid any overstocking of materials on-site and ensure strict inspection and supervision of onsite use of the materials.

d. Methods

The construction methodsused is mainly detailed at the planning stage as well as the execution stage of the construction project. The construction project plan in terms of the methods to be used should be refined as the project progresses. The construction methods selected should meet the technical solutions and process testing adopted by the contractor.

Reference no: EM13786414

Questions Cloud

Obligation of an organizations management to make decisions : The obligation of an organization's management to make decisions and take actions that will enhance the welfare and interests of society as well as the organization is referred to as:
Interview and background research : Description of the selected disorder (Identify the DSM diagnostic category for the disorder and distinguish between diagnostic and commonly used terminology.)Causative factors of the disorder
An organization : An organization is a: Social entity that functions in an unstructured manner. Reference group which is goal-directed and not deliberately structured
Nature and extent of gunshot wounds : For this question, identify in writing the nature and extent of gunshot wounds and the characteristics of the wounds such as searing, reentry, ricocheting, and the bullet track. Describe each one and how they are inflicted
Project management new house construction : Normal 0 false false false EN-US X-NONE X-NONE PROJECT MANAGEMENT OPTION -..
Characteristics of effective goal setting : All of the following are characteristics of effective goal setting EXCEPT:
Requirement and monthly load rate for each product : An existing warehouse will be used for the storage of six product families. The warehouse consists of storage bays of size 20’ x 20’. Dock 1 has been designated as the receiving dock, while dock 2 is used as the shipping dock. The area requirement an..
Overview of data communications : Overview of Data Communications. What three disciplines are involved in data communications. What are the conceptual pieces of a data communications system
Write a paper on incidence of fatal police shootings in usa : Write a five to six pages paper on the incidence of fatal police shootings in America today.

Reviews

Write a Review

Project Management Questions & Answers

  Case study - australians speleological app project

problem/opportunity statement, critical assumptions and constraints and analysis of options and recommendations.

  Perceived failures - critically analyse the case

Critically analyse the case you have selected in order to detail the underlying reasons for the "perceived failures" in the project. Ensure that you make appropriate references to project management literature.

  Using the cut-and-try method for aggregate operations

Using the cut-and-try method for aggregate operations planning we can determine the production requirement in units of product. If the beginning inventory is 100 units

  The food and drug administration could use data

The Food and Drug Administration (FDA) could use data it has collected from millions of suspected drug-related adverse event reports and other electronic medical information to identify a pattern of adverse drug event

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Determined the actual number of workstations

You have just determined the actual number of workstations that will be used on an assembly line to be 8 using the assembly-line balancing procedure

  Why are pms so concerned with resource allocation

Given the fact that a project's resources requirements are clearly spelled out in the projects action plan and why are PM's so concerned with resource allocation?

  Describe how attitudes can affect your communication with

describe how attitudes can affect your communication with non-nativesexplain what are the prevailing attitudes in your

  Calculate minimum costs times and cost schedulesconsider

calculate minimum costs times and cost schedulesconsider the following table of crash times and costs for the above

  How the project will be measured for success

Using the above scenario, develop a project charter. Include the problem statement, justification for the project, and how the project will be measured for success.

  The time to complete a project may be shown in a chart thus

the time to complete a project may be shown in a chart thus the sequence of activities for completing the project may

  Unimed is a manufacturer of specialty medical equipment

Unimed is a manufacturer of specialty medical equipment. For one particular varety of equipment offered:Average daily demand is 25 units, with a standard deviation of 6 units

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd