Process analysis and charting

Assignment Help Operation Management
Reference no: EM13681120

Problems concerned with Process Analysis and Charting

3. Analyze the way chili is made and served at Wendy's. Then, draw a process chart for the steps required to make and serve it. Draw a process flow layout chart for the Wendy's restaurant being studied.

5. Analyze the service process of making travel arrangements. Then draw a process chart for a travel agent setting up the itineraries and reservations for a business trip to be taken by two company executives who are traveling by air from Chicago to Los Angeles. Draw a process flow layout chart for the agent and the agency. Compare this to the booking on the internet.

Problems concerned with Creating a Production Process

12. Research how to service copy machines. Create a process chart for providing this service on a business-like basis. What work configuration do you recommend?
17.The Preventive Maintenance Strategy Problem

In the subway system of Metropolis, there are 100,000 light bulbs that are at risk for failure with the rates described as follows. The complete preventive maintenance policy is to replace all of the bulbs at once, four times per year. These light bulbs are long-life light bulbs, which costs more than regular ones.
Each of these bulbs has an expected average life of 3,000 hours and cost $7.00. The setup cost for each subway station is $5,000 and there are 50 stations.
In the subway, each light bulb remains lit, day and night, all year long, which is a total of 8,760 hours. Burned out and broken bulbs are only replaced during the TPM sweep. This could mean that station platform light is not always sufficient. At an extra cost, remedial replacement could be used. The total sweep would still take place, replacing all the light bulbs, whether or not they were newly replaced.

For this problem, ignore remedial replacement and its extra cost.
A. Is the total replacement sweep four times per year likely to be sufficient? (Note: The distribution is such that many light bulbs burn out long before the expected lifetime is reached, and many last considerably longer than 3,000 hours.)
B. What is the total cost for the following TPM policy?

19.The alternative strategy (using information from problem 17) is to replace each bulb as it burns out. Replacement costs $5 per light bulb in addition to the $7 purchase cost per bulb. As noted in the previous problem, bulbs have an expected lifetime of 3,000 hours. Each light bulb in the subway remains lit, day and night, all year long, a total of 8,760 hours. The expected number of times each bulb will burn out per year is 2.9. For ease of calculation, round this off to 3 times per year that each light bulb is changed.

How does the service (setup and changeover) procedure used for racing cars differ from that of regular auto servicing? Is there anything that can be learned from the difference? What does this query have to do with SMED?

Reference no: EM13681120

Questions Cloud

Multivariate statistics : Multivariate Statistics
Memorial hospital : Memorial Hospital
Discuss what motivational factors : Discuss what motivational factors
Why did the venture between apple and gt fail : Why did the venture between Apple and GT fail?
Process analysis and charting : Process Analysis and Charting
Chariot a dallas based hotel chain, : Chariot, a Dallas based hotel chain,
Linear programming case study : Linear Programming Case Study
Find the principal : Dr. Sand borrowed some money to buy new furniture for her office. She paid $182.88 simple interest on a 5.5-year loan at 9.5 percent. Find the principal.
Find her finance charge and the new balance : Find her finance charge and the new balance on November 1.

Reviews

Write a Review

Operation Management Questions & Answers

  Calculate the budgeted operating income

Foster Company makes power tools. The budgeted sales are $420,000, budgeted variable costs are $147,000, and budgeted fixed costs are $227,500.

  Business plan that highlights financial, marketing aspects

Imagine that you are beginning the very first social networking site, fast-food restaurant, or pizzeria, and develop a brief business plan that highlights the financial, marketing, and organizational aspects.

  What is this years forecast using the linear trend

What is this year's forecast using the linear trend (regression approach)?

  Illustrate what competitive advantage do you think live

Illustrate what growth strategy does live nation appear to be utilizing. Illustrate what competitive advantage do you think live nation has.

  What advantages does research offer to the decision maker

Is it possible to make sound marketing decisions without marketing research? What advantages does research offer to the decision maker over seat-of-the-pants decision making?

  A department store attempts to gain a competitive benefit

a department store attempts to gain a competitive advantage by empowering its salespeople in the cosmetics department

  Briefly discuss the sequence of construction

Briefly discuss the sequence of construction for this project, including the rolling sequence for the hot-mixed asphalt pavement portion of the project

  Data center design reduce hvac requirements

What aspects of data center design reduce HVAC requirements?

  How many people must attend each seminar for golden age

The company seems to be competitive with other companies in the same business. How many people must attend each seminar for Golden Age to break even.

  Calculate the z score of the airplanes lateness

The average lateness for one of the top airline companies is 10 minutes. The Standard Deviation of the lateness measure is calculated as 3.

  Examine each of the cells and write a brief statement

Assume that a security model is needed for the protection of information in your class. Using the CNSS model, examine each of the cells and write a brief statement on how you would addess the component represented in that cell.

  Calculate the average setup cost per year

Radovilsky Manufacturing Company, in Hayward. California. makes flashing lights for toys. The company operates its production facility 300 days per year.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd