Power factor are we assuming for the load

Assignment Help Other Engineering
Reference no: EM13866479

SCOPE

Frequently an engineer is given the assignment to develop test procedures for new equipment that has been received.  The engineer's job may be a test engineer's job in a test or maintenance facility or the assignment is for training.  The scope of the project is to design a test procedure for a voltage transformer knowing limited nameplate information about it.  This part of the course will satisfy the requirement for the design portion and term project of the course.

PROBLEM

You have been given a transformer with the following information:

  • Nameplate KVA is 50KVA
  • Voltage  levels are 7200/240/120VAC
    • (the 240 V secondary is center tapped to give 120VAC(line-to-neutral)
  • Frequency is 60Hz

Develop a series of step by step tests to measure and or calculate transformer parameters that would be suitable for publishing in a certified test report.  To be specific, the following data should be measured or calculated:

  • Resistance of the high voltage winding
  • Resistance of the low voltage winding
  • High voltage side current for no load and full load tests OR Low voltage side current for no load and full load tests
  • No load losses at nominal voltage
  • Full load losses at nominal current
  • Percent excitation current
  • Percent Z at room temperature
  • Percent R at room temperature
  • Percent X at room temperature
  • Percent regulation at 100% power factor
  • Percent regulation at 80% power factor
  • Efficiency at loads of 50%, 100%
  • Polarity indications for the high voltage and low voltage winding

To find one or more of these parameters you will have to provide:

  • Bill of Material for each test with chosen instrument model numbers, equipment accuracy specifications, and data sheets
  • Equipment wiring diagram (a pictorial) showing equipment interconnection FOR EACH TEST
  • A step by step procedure stating what you are testing, why you are testing it, and what data you expect to record
  • What engineering formulas are required to calculate requested data.

Question about the project:

For the efficiencies of the transformer, what power factor are we assuming for the load? Also No load losses are the same as the losses in the Core resistance under open circuit test, correct?  Also do we have to do test for both the 120 tap and 240 tap?

Reference no: EM13866479

Questions Cloud

Input impedance on transmission : An antenna having an input impedance on transmission of 70+j30 ohms is used on reception by connecting directly to a 50 ohms transmission line which is perfectly matched to a pure resistance load.
What two requirements would the board of directors have : Prepare any journal entries that National Chocolate Corp. should make on the four dates mentioned in the press release. What two requirements would the board of directors have considered before making the dividend decisions?
Many jurors assume the defendant has insurance : Many jurors assume the defendant has insurance coverage and therefor no harm is done by awarding the plaintiff damages. What are the moral hazards? What is the affect on insurance premiums on consumers?
The fifo to the average cost inventory : At the beginning of 2011, the Brett Company decided to change from the FIFO to the average cost inventory cost flow assumption for financial reporting purposes. The following data are available in regard to its pretax operating income and cost of goo..
Power factor are we assuming for the load : For the efficiencies of the transformer, what power factor are we assuming for the load? Also No load losses are the same as the losses in the Core resistance under open circuit test, correct?  Also do we have to do test for both the 120 tap and 2..
What scheme does the kernel in unix system v follow : What scheme does the Kernel in Unix System V follow while choosing a swap device among the multiple swap devices? 2) What is a Region?
What is gestalt therapy : What is Carl Rogers Person centered counseling And how to use/apply, What is Solution focused counseling And how to use/apply, What is Empty chair technique And how to use/apply and What is Gestalt Therapy And how to use/apply
How much do you have to deposit today : How much do you have to deposit today so that beginning eleven years from now you can withdraw $10,000 a year for five years (periods 11 to 15) plus an additional amount of $20,000 in that last year (period 15)? Assume an interest rate of 7% p.a.
What is difference between historic and new bsd release unix : What is major difference between the Historic Unix and the new BSD release of Unix System V in terms of Memory Management?

Reviews

Write a Review

Other Engineering Questions & Answers

  Why the bernoulli process assumptions might not hold here

What is the largest value of n so that P(Y > 0) = 0.02 and briefly explain why the Bernoulli process assumptions might not hold here.

  Explain the difference in a technical performance measure

good understanding of Mil-Std-499 and Mil-Std-499A

  Basic environment project plan development

The company's project proposes to increase the current ten terabyte data by twenty per cent annually. It also describes the relationship and integration between systems and infrastructure. Database and Data Warehousing, Analytics, Interfaces and C..

  Review and analyse the role of engineers as managers

This assignment addresses, in part, some of the following objectives for the course as outlined in the course specification:

  What the primary difference between eeprom and flash eeprom

a what the primary difference between eeprom and flash eeprom in terms of how they can be used?b approximately how many

  Reading output voltage from potentiometer voltage divider

Wire the circuit for Reading the output voltage from Potentiometer Voltage Divider. Verify and upload the sample program, adjust the potentiometer to display reading on the serial monitor

  Describe the stepping stone method

The stepping stone method is being used to solve a transportation problem. There is only one empty cell having a negative improvement index and this index is -2. The stepping stone path for this cell indicates that the smallest quantity for the ce..

  Evaluate the online crm system of your bank what are the

what are the motivations for an organization to have a good supply chain management scm system? define scm in your own

  Define kirchoffs first and second laws

Determine the characteristic curves for the fan and define Kirchoffs first and second laws - determine the pressure to be developed by a single mine fan to ventilate the workings.

  Calculate bearings and distances of the roads chords

Calculate bearings and distances of the roads chords and secants.Whilst it is acceptable to use CAD to present your answers the exercise becomes trivial if it is used to calculate the solution. Calculations should be made with a programmable calcu..

  About satellite communication

Justify the circumstances in a business situation in which you would use GEOS, LEOS, and MEOS.

  Discuss the effects of project constraints

Installation process and training plan summary: Provide a time line that identifies the specific steps--including training--and related resources required to implement the recommended system. Include a narrative explanation that discusses the effe..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd