Implement lean project management

Assignment Help Project Management
Reference no: EM132203634

Assessment Specification

Case study: Organising a world class sporting event emphasizing on lean project management.

Your tasks

This assessment item requires you to work INDIVIDUALLY. As the project manager in charge of delivering such as an important world sporting event, you are required to produce a REPORT to be submitted to the organising committee.

Questions:
1. With regards to the event that you have chosen to organise, identify and elaborate
a. The processes from PMBOK or Prince2 that you would use to help with the stakeholder management
b. The critical stakeholders for the event

2. In what ways would you have implemented lean project management for this event? (You need to identify and elaborate the areas and opportunities where you can eliminate waste).

3. Identify and elaborate processes from PMBOK, PRINCE2, Organisational Project Management (OPM), Agile Practices and Lean Six Sigma (DMAIC Methodology) that could be used to implement lean project management.

Important Information
Formatting. The report should be presented in 1.5 line spacing, 12 point Times New Roman font. Report section headings and numbering 1.0,

1.1.2 etc. is expected.

Supporting diagrams / figures may be presented in other formats - Excel, PowerPoint slides, PDF documents, as part of the appendix and will not count towards the essay's word limit. The reference list will also not be included in the word count.

Tables should be placed in the report. It should be labelled correctly (Table 1, Table 2 etc) and shall be included in the word count.

The submission should contain a coherent, but necessarily restricted review of the academic literature on the project management topics in question. The literature review should be integrated into the essay, not a separate section. Do not include an executive summary or an abstract.

This assessment item involves researching your assigned topic to enhance your understanding of lean project management concepts and utilisation of academic literature. Whilst you use the recommended textbooks and lecture materials, you may also refer to relevant peer reviewed, academic journal articles. A reference list (comprising between 5 - 10 references) formatted in the prescribed APA style is compulsory.

Attachment:- Assessment.rar

Verified Expert

Project management is the practice of initiating, planning, executing, controlling, and closing the work of a team to achieve specific goals and meet specific success criteria at the specified time. The primary challenge of project management is to achieve all of the project goals within the given constraints. This information is usually described in project documentation, created at the beginning of the development process. The primary constraints are scope, time, quality and budget. The secondary — and more ambitious — challenge is to optimize the allocation of necessary inputs and apply them to meet pre-defined objectives. This paper is written on organizing FIFA Event and in Microsoft Word Document File.

Reference no: EM132203634

Questions Cloud

Discuss the evolution of information technology : Identify and discuss the evolution of Information Technology and the impact it has had on businesses.
The initial plan was to reduce focus on social media : The initial plan was to reduce focus on social media and focus more on traditional and sports marketing vehicles.
What is meant by the legal definition of standard of care : LE001: Legal Requirements and Ethics Questions, Walden University USA. Define what is meant by the legal definition of "standard of care." (1-2 paragraphs)
Businesses sometimes perpetrate crimes : Businesses sometimes perpetrate crimes; and often are the victims of crime. What is a crime?
Implement lean project management : PPMP20009 Leading Lean Projects - Case study: Organising a world class sporting event emphasizing on lean project management
Strategies for leaders to retain employees : Support system. Leaders need to provide a support system for teachers and staff to discuss and improve their work.
Various parts funded at the current level is unethical : Do you think executive compensation in its various parts (i.e., salary, stock options, severance packages) funded at the current level is unethical?
Statement of cash flows as rent paid : What amount would be reported in the statement of cash flows as rent paid using the direct method?
Pioneer first case that was worked on by human services : Describe the pioneer's first case that was worked on by human services.

Reviews

len2203634

12/27/2018 10:39:07 PM

4.Clarity of expression, grammar, spelling, final summary and correct APA style referencing (out of 4 marks) Marks available • The writing is difficult to follow, with incoherent or illogical arguments. • There are many errors of spelling or grammar. • Sections are unrelated. • No citations are included in the text of the essay, and there is no reference list at the end. • The arguments make sense in places, but there are also illogical arguments, confusing sentences or sudden changes of topic. • There are numerous errors of spelling and grammar. • There is a reference list but it does not comply with APA refererencing style • Most statements are clear but some require re- reading and guessing about meaning as they are not clear. • Sentence structure can be improved for simplicity, clarity and ease of comprehension. • Few grammar or spelling errors • APA referencing style is used with some format errors or inconsistencies. • Statements are clear and well-connected. There is a logical flow of ideas.

len2203634

12/27/2018 10:38:41 PM

Ways or areas to implement lean project management • Did not mention any best practices to implement lean project management • Did not describes the areas of waste that is to reduced or eliminated • Did not describes how the case will be addressed and gives the reader a clear and compelling desire to read on. • Identified ONE best practice to implement lean project management • Vaguely describes the areas of waste that is to reduced or eliminated • Did not describes how the case will be addressed and gives the reader a clear and compelling desire to read on. • Identified TWO best practice to implement lean project management • Satisfactorily describes the areas of waste that is to reduced or eliminated • Did not describes how the case will be addressed and gives the reader a clear and compelling desire to read on. • Identified THREE best practice to implement lean project management • Clearly describes the areas of waste that is to reduced or eliminated • Did not describes how the case will be addressed and gives the reader a clear and compelling desire to read on.

len2203634

12/27/2018 10:38:15 PM

Marks available (out of 3 marks) 0 0.5 / 1.0 / 1.5 2.0 / 2.5 / 3.0 1b. Correct identification of critical stakeholders • Totally incorrect identification of stakeholders n/a Incomplete identification of stakeholders. Some stakeholders are identified but is difficult to read and does not relate n/a • Full list of stakeholder are identified and clearly described which includes all the relevant information. • Gives the reader a clear and compelling desire to read on. 3

len2203634

12/27/2018 10:38:08 PM

PPMP 20009 Marking Rubric Assessment 1 (Individual Work - 40%) Attributes Fail Developing Competent Accomplished Outstanding Marks Awarded 1a. Correct usage of processes for effective stakeholder management • Process for stakeholder management not identified n/a • Weak identification and description of Stakeholder Management processes n/a • There is a clear identification and description of the stakeholder management processes which includes all the relevant information. • Gives the reader a clear and compelling desire to read on. 3

Write a Review

Project Management Questions & Answers

  Create presentation to support collaborate of your proposal

Create PowerPoint slides to support Collaborate of your proposal. Submit along with presentation notes. Find important information in Technical Communication.

  What constitutes a well-maintained system

What constitutes a well-maintained system, in terms of function, utility, and reliability and how does the truly effective SysAdmin ensure success?

  Describing the expectancy theory

As far as describing the Expectancy Theory and give examples of its use in project management.

  Explain critical aspect of project management

Risk management is a critical aspect of project management. The supply chain decisions that are made have risk involved like any other project decision.

  Multicultural arrangements in engineering and procurement

What are the main advantages and disadvantages of multicultural arrangements in engineering, procurement and construction projects?

  What are the aspects of managing risk for a project

One of the most important aspects of managing risk for a project is to accurately define the size of the project. Determine the criteria that must be considered

  What is the standard a court uses to award dollar damages

What is the standard a court uses to award dollar damages when lost profits are involved?- Why should a party who has not breached a contract be required to mitigate the damages of the breaching party?

  Key sources of risk

What are the key sources of risk that you see in this project?

  What problems does present for project managers

Class, another issue is the long work week experienced by many people, who work 50 or 60 hours a week. This is becoming more common as companies push.

  What exchange risk did arco face

In January 1988, Arco bought a 24.3% stake in the British oil firm Britoil PLC. - What exchange risk did Arco face, and did it choose the best way to protect itself from that risk?

  Perform a limited scope risk assessment

Perform a limited scope risk assessment of A T & T, the telecommunications giant. Gather relevant intelligence on the company, such as the latest press releases, articles, and SEC 10K filings.

  Construct a tracking gantt chart using ms project

Using the information in Problem, highlight the project's status on day 14 but assume that activity D has not yet begun.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd