How to create a work breakdown structure

Assignment Help Other Subject
Reference no: EM131233055

Work Breakdown Structure (WBS)

Within reason, is there such a thing as a project that is too complex to complete? Consider the Space Shuttle. One of the most complex machines ever built, the Space Shuttle had over 2.5 million parts, each of which had to be accounted for by someone. How did anyone manage to track and properly assemble these parts? The answer is through the application of a work breakdown structure (WBS). A WBS is a fundamental tool that project managers use to organize and divide the work of a project. A WBS focuses on breaking down a project's scope into individual deliverables that may be created by assigned team members.

There are multiple work breakdown structure formats and each has its own advantages and disadvantages. Project managers select a type of WBS based upon the specifics of the project they are managing. Each WBS format emphasizes different aspects of a project. These varied perspectives may each be appropriate, depending upon what information a project manager needs.

In this Discussion, you analyze different WBS formats and evaluate whether they meet basic criteria for clarity.

To prepare:

Explore the Work Breakdown Structure Formats document included in this week's Learning Resources. The document presents a scenario and three corresponding WBS formats that pertain to the scenario. (SEE ATTACHED PDF FILE)

Consider the advantages and disadvantages of each WBS format included in the document.

Think about the level of detail dedicated to task information in each WBS format. Evaluate the formats based on the following criteria for clarity:

The task has a measurable status or completion.
The task has defined start and end events.
The task has a deliverable.
The task's time and cost are easily estimated.
The task can be completed without interruption and additional input after its start.

Post by tomorrow 10/04/16 a minimum of 550 words essay in APA format with 3 references. Based on the Work Breakdown Structure Formats document attached in the file area, address the level one headings as numbered below:

1) An analysis of the advantages and disadvantages of each work breakdown structure format.

2) Provide an analysis of whether (and how) the work breakdown structures meet the assigned criteria for clarity.

3) Provide a rationale for your response.

Required Readings

Biafore, B. (2010). Microsoft Project 2010: The missing manual. Sebastopol, CA: O'Reilly.

Chapter 4, "Breaking Work Into Task-Sized Chunks" (pp. 77-100)
This chapter explains how to create a work breakdown structure and how to import a work breakdown structure into Microsoft Project.

Coplan, S., & Masuda, D. (2011). Project management for healthcare information technology. New York, NY: McGraw-Hill.

Chapter 3, "Project Management"
"Prepare Work Breakdown Structure and WBS Dictionary" (pp. 53-56)

This section of Chapter 3 reviews the core processes of preparing a work breakdown structure (WBS). The chapter provides an example of a WBS and details its essential components.

Project Management Institute. (2013). A guide to the project management body of knowledge (PMBOK guide) (5th ed.). Newtown Square, PA: Author.

Chapter 5, "Project Scope Management"
5.3, "Create WBS" (pp. 125-132)

This section of Chapter 5 reviews the process of creating a work breakdown structure. Specifically, the chapter examines how to determine inputs, WBS tools and techniques, and outputs.

Kendrick, T. (2009). Identifying & managing project risk: Essential tools for failure-proofing your project(2nd ed., Ebrary version). New York, NY: AMACOM.

Retrieved from the Walden Library databases.

Chapter 3, "Identifying Project Scope Risk" (pp. 40-69)

This chapter examines methods of identifying scope risks and the types of scope risks pertaining to project deliverables. The chapter highlights a variety of sources of scope risk as well.

Shirey, M. R. (2008). Project management tools for leaders and entrepreneurs. Clinical Nurse Specialist, 22(3), 129-131.
Retrieved from the Walden Library databases.

The author of this article introduces project management tools that clinical nurse specialists may use to coordinate team work. The article highlights the usage of one such tool, the Gantt chart.

Thomas, M., Jacques, P. H., Adams, J. R., & Kihneman-Wooten, J. (2008). Developing an effective project: Planning and team building combined. Project Management Journal, 39(4), 105-113.

Retrieved from the Walden Library databases.

This article analyzes project planning and control and the process of developing a project plan. The article also reports the results of research that sought to determine 137 organizations' approaches to establishing projects.

U.S. Government Accountability Office. (2009, March 2). Work breakdown structure. GAO Reports, 65-78.

Retrieved from the Walden Library databases.

This article examines the importance of a work breakdown structure (WBS) in project management. The chapter demonstrates how a WBS assists in resource identification, cost estimation, and risk determination.

Wu, Z., Schmidt, L. P., & Wigstrom, M. S. (2010). Product development workflow management based on work breakdown structure. IIE Annual Conference. Proceedings, 1-5.

Retrieved from the Walden Library databases.

The authors of this article highlight the usage of WBS in managing complex product development projects. The authors examine how a WBS helps represent and manage the intricacies of tasks and activity relationships.

Mathis, M. (n.d.). Work breakdown structure: Purpose, process and pitfalls. Retrieved March 13, 2013, from https://www.projectsmart.co.uk/work-breakdown-structure-purpose-process-pitfalls.html

This article provides a general review of the WBS. The author focuses on the purpose, process, and pitfalls of a WBS.

Document: Work Breakdown Structure Formats (PDF) (See ATTACHED PDF IN FILE AREA)

This document presents a scenario and three corresponding work breakdown structures that you will use for your Discussion this week.

Required Media

Laureate Education (Producer). (2013c). Planning, part I: Defining project scope and activities [Video file]. Retrieved from https://class.waldenu.edu

Note: The approximate length of this media piece is 6 minutes.

In this presentation, the participants discuss defining project scope and project activities, using the work breakdown structure, and managing project risk through SWOT analysis.

Attachment:- workbreakdownstructureformats.rar

Reference no: EM131233055

Questions Cloud

Good examples of integrated marketing communication : can you think of examples of companies who are good examples of Integrated Marketing Communication ? Please indicate your reasons for mentioning the organization as doing well with IMC.
Receives the letter saturday : Shelley sends Keats an offer via U.S. mail: "I offer to manage your website at a rate of $100 per hour. You must accept by Friday." Keats signs: "I accept, but I'll only pay you $90" and puts it in the mailbox on Friday. Shelley receives the lette..
What market structure describes cable tv in a city : What market structure describes cable tv in a city. Would it be monopoly or monopolistic competition and why
Calculate the work and heat transfer for the process : Write a program to solve the general case of Problem 6.111, in which the initial state and the expansion ratio are input variables.
How to create a work breakdown structure : Explore the Work Breakdown Structure Formats document included in this week's Learning Resources. The document presents a scenario and three corresponding WBS formats that pertain to the scenario.
Proposing an anti-price gouging law : You are an economic adviser to Congressman Spoutwell. The Congressman is considering proposing an anti-price gouging law in his state which would take effect after hurricanes.
What are two important segment of the general environment : What is the relationship among contract law, the UCC, and commercial law? What is the one most important Primary Activity in InterfaceRAISE’s Value Chain and why? Based on the analysis you conducted above, what is one well reasoned, well supported re..
Recent price change of a product : Demand and Supply" Please respond to the following Discuss one (1) recent price change of a product (or service) you were in the market to buy.
Investigate the first part of the process : Investigate the first part of the process, namely, bringing the water to the boiling point, by measuring it in your kitchen and knowing the rate of power added.

Reviews

Write a Review

 

Other Subject Questions & Answers

  Explain the major role of law enforcement intelligence

Discuss the major role of law enforcement intelligence in combatting domestic terrorism. Assess the importance of this role in preventing future domestic terrorist attacks.

  Explore how similar experiences have impacted your behavior

Conformity is something that occurs when social influences impact or modify our behavior in response to real or imagined pressure from others rather than in response to a direct request or order from another.

  Develop a research question about your behavior

Develop a research question about your behavior that can be researched in two ways. You should be able to research the question using existing literature.

  Presentation for early childhood and middle childhood groups

presentation for early childhood and middle childhood groups that addresses health issues appropriate for each developmental level.

  Native american tribe residing in continental united states

Choose one (1) Native American tribe residing within the continental United States (Lower 48 states) at the time of first European contact. Research various aspect of the chosen tribe's culture or history.

  Changes in behavior

Changes in our thinking inevitably lead to changes in behavior because thinking patterns predispose an individual to take physical actions that are commensurate with those thinking patterns

  What is the progress of state licensure legislation in your

after reading the laboratory medicine article on state licensure for cls summarize the pro and con arguments

  What two variables were being tested for a correlation

What two variables were being tested for a correlation? How were these variables operationally defined? What correlation coefficient was found? What does the number (coefficient) mean

  Benefits and disadvantages of different techniques

To review research on current techniques Eating Disorder the results of your research should be useful. You should include in your techniques for review: Motivational Interviewing and CBT.

  Find the current output of the solar cell

A 100W CO2 laser which radiates at 1.55 x 10-6 m is directed at a solar cell. What is the current output of the solar cell?

  Briefly describe the physical or mental health issue

Differences between genders in the incidence, mortality rate, diagnosis, and prognosis of that health issue - what are the gender-related lifestyle and behavioral differences that lead to and prevent the health issue?

  Special event nonprofit fundraiser

Critically discuss the three most important elements to a successful special event nonprofit fundraiser. Support your rationale as to why these are important considerations.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd