How many workers will lackey need to add

Assignment Help Operation Management
Reference no: EM13251803

Charles lackey operates a bakery in Idaho Falls. Because of it's excellent product and excellent location, demand has increased by 25% in the last year. On far too many occasions, customers have not been able to purchase the rbead of their choice. Because of the size of the store, no new ovens can be added. At a staff meeting , one emploee suggested ways to load the ovens differently so that more loaves of bread can be backed at one time. This new process will require that the ovens be loaded by hand, requiring additional manpower. This is the only thing to be changed. If the bakery makes 1,500 loaves per month with a labor productivity of 2.344 loaves per labor hour, how many workers will Lackey need to add ? Hint: Each woker works 160 hours per month.

Reference no: EM13251803

Schedule jesses staff with the minimum number of barbers

Jesse's Barber Shop at O'Hare Airport is open 7 days a week but has fluctuating demand. Jesse is interested in treating his barbers as well as he can with steady work and pr

Who do you want to be on this task force

As the company's sales are coming down unexpectedly, the president asks you to chair a task force with the objectives of developing solutions to correct the situation. Who d

What is the capacity of the process

What batch size would you choose in order to minimize the inventory without reducing the process capacity? Assuming that all units of a batch have to be processed before the

What is the capacity of the process

What batch size would you choose in order to minimize the inventory without reducing the process capacity? Assuming that all units of a batch have to be processed before the

How many miles of pipeline arctic oil must install

Create a spreadsheet model to determine how many miles of pipeline Arctic Oil must install if it runs separate pipelines from each oil well to the T&R center. How much pipe

What is the process specification

Studies on a bottle filling machine indicates it fill bottles to a mean of 16 ounces with a standard deviation of 0.10 ounces. What is the process specification, assuming th

Which one does a project manager have least control over

Which metric does a project manager have most control over: cost variance, schedule variance, cost performance index, and schedule performance index? Explain how so. Which o

Communicate the status of quality during a project

While cost and time are critical components of projects, how would you define the quality of a project? Provide some examples of project reporting metrics a project manager

Reviews

Write a Review

 
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd