Discuss characteristics of different phases of a project

Assignment Help Project Management
Reference no: EM131264089 , Length:

READ WHERE I HIGHLIGTED IN BOLD

Learning outcomes and pass attainment level specific to this assignment:

On completion of the course of study, students should be able to:

1. Determine both the role of and means by which Operations Management can lead to organisations being successful in managing its operations both efficiently and effectively.

2. Distinguish the core concepts involved in project management and understand how they can be employed in the management of a business-related project.

3. Formulate, design and execute a project plan of a business situation using the appropriate planning tools and then evaluate and correctly apply the appropriate management planning methodology within a business project context.

4. Communicate analysis, results, conclusions and recommendations in a professional manner

Presentation

1. Print Single sided in an Arial 12 point font.

2. Paper A4 stapled top left corner.

3. 1.5 line spacing or follow any set regulated spacing.

4. Ensure that there is good usage of grammar and correct spelling throughout.

5. Neatly present the final work.

6. Do not use an additional cover/folder.

Coursework Assignment

The aim of this assessment is to test your ability to:

Appraise the role and attributes required of the project manager given the context of this case study

Propose a business case for change

Discuss the characteristics of the different phases of a project

Apply project management tools and techniques includingthe use of vendor software, to identify, estimate, cost and manage the resources, milestones and activities required for the proposedchange

Discuss management and leadership issues associated with projects, including the roles of the key players in projects

Identify the probability and impact of risks associated with the project and make recommendations of how these should be managed

Present the results of your analysis in a professional manner by means of a Business Report.

Birmingham Brewery Company: Case Study

A small Birmingham-based craft beer brewery company has now been in operation for just over three years, since their start-up there has been increasing customer orders year-on-year. Such is the popularity of their products thatthe company foresees in the near future that they will experience greatercomplexity in managing capacity, inventory, stock returns, orders, receipts and payments as their business and reputation continue to grow. This failure to manage these parts of their operations may impact adversely on working capital, cash flow, loss of orders and customer dissatisfaction.

In order to start to plan for and address these foreseen complexities, Birmingham Brewery Company have tasked you as an external consultant, on a day rate of £500, to produce a 3,500 word project plan that details the activities and costs of implementing an Enterprise Resource Planning (ERP) system, into the company's core operations functions. Your choice of ERP system must meet the Company's current need. Within the project justification your plan must explicitly sell the benefits of adopting such a system, as well as detailing how your plan addresses some of the issues associated with a business implementing an ERP system.

Your plan is required to include both external and internal costs and activities. In order to deliver some of the identified activities internally you can draw on the following Sadler's Ales staff, who each have 25 days holiday a year and work from 08.00am to 17:00 each day:

Managing Director - Internal day rate £750
Sales Director - Internal day rate £500
Company accountant - Internal day rate £500
Head of Sales and Administration - Internal day rate £350
Project Administrator - Internal day rate £150
3 x Brewers - Internal day rate £200

Some activities will require further external consultancy and/or support. These activities are to be estimated as accurately as possible in terms of time and cost, drawing on referenced data.

Birmingham Brewing Company

Statement of Financial Position

 

Company

31/12/2015

31/12/2014

31/12/2013

31/12/2012

Currency

GBP 000's

GBP 000's

GBP 000's

GBP 000's

Tangible fixed assets

955

478

335

-

Intermediate assets

1,697

0

0

-

Intangible assets

0

0

0

0

Total fixed assets

2,652

478

335

272

Stocks

305

219

110

40

Trade debtors

650

356

124

42

Cash

652

324

0

0

Misc. current assets

96

108

15

0

Total current assets

1,703

1,007

249

82

Creditors: amounts falling due within one year

769

646

363

280

Net current assets

934

361

(114)

(198)

Capital Employed

3,586

839

221

74

Total long term liabilities

184

204

168

105

Total liabilities

953

850

531

385

Net Worth

3,402

635

53

(31)

Share capital

1,135

592

0

0

P&L account reserve

311

43

53

(31)

Other reserve

1,956

0

0

0

Shareholders' funds

3,402

635

53

(31)

Working capital

934

361

(114)

(198)

Net worth (Less intangibles)

3,402

635

53

(31)

Consolidated

No

No

No

No

Subsidiary

No

No

No

No

No. of Weeks

52

52

52

60

Birmingham Brewing Company

Statement of Profit or Loss

 

Company

31/12/2015

31/12/2014

31/12/2013

31/12/2012

Currency

GBP 000'S

GBP 000'S

GBP 000'S

GBP 000'S

Turnover

3,332

1,781

789

-

Cost of Sales

2,437

1,396

446

-

Gross Profit

895

385

343

-

Operating Profit

222

18

103

-

Non-Trading Income

21

0

0

-

Interest Payable

21

18

18

-

Pre-tax Profit

222

0

85

-

Taxation

(46)

10

0

-

Profit After Tax

268

(10)

85

-

Dividends

0

0

0

-

Retained Profit

268

(10)

85

-

Consolidated

No

No

No

No

Subsidiary

No

No

No

No

No. Of Weeks

52




Efficiency Ratios

 

Date of Accounts

31/12/2015

31/12/2014

31/12/2013

31/12/2012

Debtor Days Outstanding

71

73

57

-

Stocks/Sales

9.2

12.3

13.9

-

Sales/Capital Employed

0.9

2.1

3.6

-

Sales/Fixed Assets

3.5

3.7

2.4

-

Asset Utilisation

0.77




Employee Performance Ratios

 

Date of Accounts

31/12/2015

31/12/2014

31/12/2013

31/12/2012

Pay/Employee (Currency)

14,135

12,240

11,000

-

Profit/Employee (Currency)

6,000

0

8,500

-

Sales/Employee (Currency)

90,054




Word Limit: 3,500 words ± 10%.

Constructing your project plan:

1.0 Executive Summary

2.0 Project Introduction
2.1 The project need - NEED A ERP FOR A SMALL BUSINESS
2.2 The project environment
2.3 The advantages and disadvantages of ERP and how these will be managed.

3.0 Project Definition
3.1 Project scope
3.2 Project methodology
3.3 Project management organisational structure and culture
3.4 Managing the proposed change
3.5 The key role and attributes of the project manager
3.6 Managing Project Stakeholders requirements

4.0 High Level Project planning (Undertaking in groups of 2 to 3)
4.1 Project mindmap
4.2 2nd Tier Work breakdown structure
4.3 Estimation of activity durations
4.4 Buffered scheduling
4.5 2nd Tier Network diagram, Critical path, and Gantt chart

5.0 Detailed Project planning using Vendor Software
5.1 Summary of decisions made including discussion on the advantages and disadvantages of using the vendor software - WRITE 300 WORDS ABOUT THIS
5.2 Estimation and allocation of durations, resources and working hours*
5.3 Identification of dependencies*
5.4 Network diagram, critical path and Gantt Chart*
*Evidenced by electronicsubmission of separate vendor software file

6.0 Finances
6.1 Indicative cash flowforecast
6.2 Cost/benefit analysis
6.3 Return on investment

7.0 Risk Management
7.1 Risk identification
7.2 Analysis of risk probability and impact using a risk matrix

8.0 Conclusions

9.0 Recommendations to the Project Sponsor

10.0 References

11.0 Appendices

References

All sources should be cited and referenced using the Harvard Referencing system. The principles of the Harvard Referencing system are detailed in the leaflets available in the library. You should NOT use the general Internet references e.g. www.google.com, www.yahoo.com and Wikipedia etc. All references should be from the credible sources e.g. books, articles, journals, magazines etc.

Feedback

Feedback on performance, problems, and presentations will take place in the seminar sessions. It is not practice to read drafts of work in progress, however you may discuss any relevant issues in the seminar slots.

Extensions: There are no extensions granted on the module. Any claim for extenuating circumstances must be made through the official University channel, read: https://icity.bcu.ac.uk/Student-Services/Complaints-and-Appeals for guidance.

Verified Expert

I have completed the solutions of 4000 words of project management. topic was implementation of sap system. I have explained the network diagram, critical path path, gantt chart also. i also explained the role of project manager and also the pest analysis of birmingham and also the advantage and disadvantage of sap ERP system. I also explained the buffer scheduling and activity duration.

Reference no: EM131264089

Questions Cloud

Coding systems and terminology : Coding Systems: Which type of coding system is indicated in each of the following independent situations? Explain your reasoning.. Terminology; Match the number to the corresponding letter
List the factors that played a role in your decision : From which of these two stores would you actually purchase the item? Why, specifically? - List the factors that played a role in your decision.
Manufacturing uses departmental cost driver rates : Count me in inc manufacturing uses departmental cost driver rates to apply manufacturing overhead costs to products. Manufacturing overhead costs are applied on the basis of machine hours in the machining department
Three important differences observed between the stores : What are the three most important differences you observed between the stores? - Using the results of your research, write a short paper that outlines your observations.
Discuss characteristics of different phases of a project : Determine both the role of and means by which Operations Management can lead to organisations being successful in managing its operations both efficiently and effectively - Distinguish the core concepts involved in project management and under..
Determine the two most critical financial ratios for you : Determine the two most critical financial ratios for you to monitor at your facility, and indicate how each of these ratios would help you assess the current performance of your facility. Provide support for your rationale.
Break-even sales and sales to realize income from operations : For the current year ended March 31, Benatar Company expects fixed costs of $1,250,000, a unit variable cost of $100, and a unit selling price of $140. Compute the anticipated break-even sales (units). Compute the sales (units) required to realize in..
Make a thermodynamic analysis of this process : The two streams at 1000 kPa would then be mixed. Determine the rates at which steam at each initial pressure must be supplied to provide enough steam at 1000 kPa so that upon condensation to saturated liquid heat in the amount of 300 kW is release..
Low cost retailers locate near low income customers : Should low-cost retailers be required to locate near low-income customers? Why or why not? - Write a brief paragraph on how the AMA Statement of Ethics relates to retailing locations.

Reviews

len1264089

11/3/2016 1:58:41 AM

1.0 Executive Summary 5 marks 500 words 2.0 Project Introduction 15 marks 1000 words 3.0 Project Definition 15 marks 600 words, plus: diagrams and calculations for cost-benefit analysis, breakeven and payback period; list of stakeholders and mapping these onto power/interest matrix. 4.0 High Level project Planning (undertaken in groups of 3 to 4) 10 marks 200 words, plus diagrams of initial: mindmap; 2nd tier WBS; Network diagram; gantt chart 5.0 Detailed Project Planning using Vendor Software 20 marks 300 words, plus electronic submission of vendor software project plan 6.0 Finances 15 marks 400 words 7.0 Risk Management 10 marks 200 words, plus mapping of identified risks onto probability/impact risk matrix 8.0 & 9.0 Conclusion and Recommendations 10 marks 300 words

len1264089

11/3/2016 1:58:25 AM

Knowledge and Understanding Excellent assured and informed explanations of complex ideas; confident and highly competent understanding of complex ideas, their significance, and the relationship between them. Critical Analysis Excellent systematic development of the argument; a very high level of critical understanding of complex issues and various ways of interpreting them; ability to synthesise ideas and viewpoints in evidence; an unusual depth of critical insight and independent thought in evidence. Research and reading Evidence of extensive independent research; highly competent use of a very wide range of sources, including journal articles; confident handling of relevant primary sources. Presentation and/or communication Excellent writing/presenting style, clear, fluent and confident; basic and complex ideas expressed very clearly; clear and logical structure; consistent use of standard English, no grammatical or spelling errors; full and accurate use of the Harvard referencing system; a clear and confident personal voice in evidence.

len1264089

11/3/2016 1:58:14 AM

please read where I highlighted red please do the whole coursework for me I need to send you separate document for PEST C and the other two journals articles please advise where can i send them

Write a Review

Project Management Questions & Answers

  Problem regarding the annuity payments

Partha owns a qualified annuity that cost $52,000. Under the contract, when he reaches age 65, he will receive $500 per month until he dies. Partha turns 65 on June 1, 2010, and receives his first payment on June 3, 2010. How much gross income wil..

  Recommend whether chandra overdraft facility should cancel

Prepare a report for Chandra explaining the errors he made in his income statement - Review the performance of Bendigo Fencing Company in 2014 and make a recommendation as to whether Chandra's overdraft facility should be cancelled.

  Create a mind map of a swot analysis

Describe one instance of a project termination that you have experienced. Analyse the steps that were undertaken to close out the project. Include your evaluation of the effectiveness of the close-out steps taken.

  Embracing enterprise risk management

The following material may be useful for the completion of this assignment. You may refer to the documents titled "Embracing Enterprise Risk Management: Practical Approaches for Getting Started" and "Developing Key Risk Indicators to Strengthen..

  Points of the project scope checklist

Briefly explain the first five points of the Project Scope Checklist in relation to your project and What are the project objectives?

  Implementation and deployment of a business intelligence

ndividual Assessment - this is an individual assignment (2000 word report). The report will be a critical appraisal of project management and planning skills required for the implementation and deployment of a Business Intelligence / Business Ana..

  The final stage in the project life cycle

Everything in this life has to come to end, that the closure process is the final stage in the project life cycle, it's the time to gather our efforts result, that we have to carefully dealing with that stage in order collect the maximum benefits fro..

  Explain the scope of the project and control measures

Describe the scope of the project and control measures. Describe the goals and objectives of the project. Include a high-level overview of all project deliverables

  Structure of the project report

Structure of the project report (for any international company), Introduction of the company and mission, vision and corporate objectives (1 page) SWOT Analysis: (strengths, weaknesses, opportunities, threats) (2pages)

  What you want to achieve with implementing a km project

Formulate a vision, what you want to achieve with implementing a KM project in a company? Conduct an internet search for published KM visions and compare them.

  How can workout update its facility to attract new customers

How can Workout update its facility to attract new customers? What additional equipment or services would you suggest? How could something as simple as revising the layout help?

  Relationships between pairs of tables and enforce integrity

Create the same chart using Access, and save it as the same name Q2CustomersPerSize in the database - Create relationships between pairs of tables and enforce referential integrity

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd