A 100 ft cut steel tape was used to measure between two property markers. The rear surveyor held 93 ft, while the head surveyor cut .67ft. What was the distance between the markers?
An activated sludge tank, 30 x 30 x 200 ft, is designed as a plug-flow reactor, with an influent BOD of 200 mg/L and a flow rate of 1 million gallons per day. a. If BOD removal is first-order reaction, and the rate constant is 2.5 days^-1, what is ..
Compute the detention time and horizontal flow through velocity. Do these values satisfy the standards for water works, which stipulate detention time is greater and equal to 30 min and 0.5 ft/min =
one gram of pepper is placed into a 100 mL beaker, and the beaker is filled with water to the 100 mL mark. What is the concentration of pepper in mg/L. What should one assume in this problem
Water flows into and out of a 5 liter tank at a rate of 1 L/min. Within the tank, the mineral apatite is dissolving at a rate of 3x10^-10 moles of Si per m^2 per sec. If the tank contains 10g of the apatite with a specific surface area of 2 m^2/g,
Determine the number of completely mixed bioreactors (detention time of 45 min each) that would be required to meet the phenol discharge limit of 5 mg/L. The first-order removal rate constant is equal to 6.1 hr -1
A MH at an intersection has an inflow from three 8-inch PVC (n = 0.01) sanitary sewer pipes laid at minimum slope converging at an intersection and one pipe taking the flow from those three further downstream.
the front of our library has six double doors and the doors rotate open in the middle making less clerance room how can i get started
flow of 600cfs is measured at a depth of 3.4 ft in trapezoidal channel with bottom width of 25ft and side slopes of 3:1(h:v). The channel reach has a slope of .002. Estimate the channel roughness.
Let event Y be a rainstorm on a given day and event X be lightning on a given day. Let probability of these events be: P(X)=0.3 P(Y)=0.1 P(Y|X)=0.5 What is the probability that both rain and lightning occur on a given day
The floor area of each floor in these buildings is 400 m^2. The buildings are separated by large lawns so that the (Exposure + Communication) factor = 1.2.
A siphone generates a flow of 1 ft/sec thru a 1 inch OD, 3/4 ID hose. A) What height difference is needed to generate this flow B) What height for 10 ft/sec C) What for 100 ft/sec
A 24-in.-long copper bar with a yield strength of 30,000 psi is heated to 120°C and immediately fastened securely to a rigid framework. The coefficient of thermal expansion for copper is 16.6x10-6 (1/oC).
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd