An open channel with a trapezoidal configuration with side batters 1V:3H is to be designed to carry 1.0m^3/s with a bedslope of 0.0065. The channel is lined with concrete with manning's n of 0.011. Find the most efficient cross section.
Labor of this activity is given as in the CREW, 1 brick mason and 1 helper. The productivity is 0.5 labor hours per 1 sf. The wages are for the mason $60 and for the helper $45 per hour.
The carrier does not intend to offer weekend service. Therefore, the carrier will offer daily round-trip flights Monday through Friday. The following table presents passenger demand estimates and fares charged by competitors
Determine the maximum and minimum stress intensities in the section.
A 1.5 m diameter culver (concrete barrel, well - rounded entrance) that is 20m long is installed on a slope of 2 percent. The design discharge is 9.5 m^3/sec and the inlet will be submerged but not the outlet.
each month the splendid dry cleaning company buys one barrel ( 42 gal., 0.160 m^3) of tetrachloroethylene (C2Cl4) (M.W.= 166, p= 1.594 g/cm^3) ninety percent of the fluid is lost to the atmosphere and 10% remains as residue to be disposed of.
Employing the ideal gas model with constant specific heat ratio k, determine the temperature at the end of the process and the amounts of work and the heat transfer per unit mass in Btu/lb
If the channel is overtopped for 2 years in a row, renovation cost will increase too much. What is the probability that the channel will be overtopped for only 2 years in a row in a 4 year period
A company has been discharging its waste into a holding pit for a long time. For the last several years, the pit has been full and overflowing into a local river. The waste concentration has been nearly constant at 10 mg/L of the pollutant of inte..
For satisfactory operation, the static pressure at the pump inlet must not be lower than -6 m of water gage. Determine the smallest standard commercial pipe that will give the required performance.
Assume that a new method allows her to sort 20 rings/min but costs $500 to implement. Is it worth implementing the new method for a batch of 50,000 rings. At what point does the new method pay off.
A structural component in the form of a very wide plate is to be fabricated from 4340 steel that was cooled using a fast cooling rate and has a yield strength of 1515 MPa and a fracture toughness (KIC) of 60.4MPam.
An equal-tangent crest curve connects a +2% initial grade with a -1% final grade, and is designed for 55mi/h. The station of the PVI is 233 + 40 with elevation 1203 ft. What is the elevation of the curve at station 234+00
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd