Reference no: EM131222007
Create Preventative Controls for SunGrafix, a video game design company. In some cases, the outage impacts identified in the BIA may be mitigated or eliminated through preventive measures that deter, detect, and/or reduce impacts to the system. Where feasible and cost effective, preventive methods are preferable to actions that may be necessary to recover the system after a disruption. Preventative controls include the identification of effective contingency planning preventive controls and maintaining these controls on an ongoing basis.
Identify and incorporate a variety of preventive controls into your BCP. Some of the listed controls are the following:
Appropriately sized uninterruptible power supplies (UPS) to provide short-term backup power to all system components (including environmental and safety controls);
Gasoline- or diesel-powered generators to provide long-term backup power;
Air-conditioning systems with adequate excess capacity to prevent failure of certain components, such as a compressor;
Fire suppression systems;
Fire and smoke detectors;
Water sensors in the computer room ceiling and floor;
Heat-resistant and waterproof containers for backup media and vital non electronic records;
Emergency master system shutdown switch;
Offsite storage of backup media, non-electronic records, and system documentation;
Technical security controls, such as cryptographic key management; and
Frequent scheduled backups including where the backups are stored (onsite or offsite) and how often they are recirculated and moved to storage.
Data analysis skills and thinking
: Submit a paper of at least four pages in length, excluding the title and reference pages, that includes at least two scholarly sources (in addition to the text). Explain in detail why data analysis skills
|
Calculate total stockholders equity at the end of the year
: At the beginning of the year paid in capital was $82 and retained earning was $47. During the year the stockholders invested $24 and dividends of $6 were declared and paid. Retained earning at the end of the year were $52. How to calculate Total stoc..
|
Assesses the evaluability of program
: Write a 2- to 3-page paper which assesses the evaluability of this program, using the criteria in the readings for this week and indicates whether you anticipate that a formative, process, needs assessment, or summative evaluation will be most app..
|
Prepare an accounts receivable aging report
: What will the report look like? Prepare an accounts receivable aging report in excel or another spreadsheet package? How will you distribute the report? How many copies will you make? Who should receive the copies? What security features will you imp..
|
Create preventative controls for sungrafix
: Create Preventative Controls for SunGrafix, a video game design company. In some cases, the outage impacts identified in the BIA may be mitigated or eliminated through preventive measures that deter, detect, and/or reduce impacts to the system.
|
What did the company executives do wrong
: What did the company executives do wrong? What were 5 intangible costs of the scandal ($ value is not required)? How and what type of CIA controls would have decreased the potential for the scandal.
|
What is the par per share after the split
: On June 13, the board of directors of Siewert Inc. declared a 2-for-1 stock split on its 60 million, $1 par, common shares, to be distributed on July 1. The market price of Siewert common stock was $25 on June 13. Prepare the journal entry to record ..
|
Part of project integration management
: Name the main planning tasks performed as part of project integration management? What are the main documents created, and what should they contain?
|
What is the minimum number of cells possible in c
: A data cube, C, has n dimensions, and each dimension has exactly p distinct values in the base cuboid. Assume that there are no concept hierarchies associated with the dimensions.
|