Create one detailed project plan in work breakdown structure

Assignment Help Other Subject
Reference no: EM131017292

Assignment 1: Based on the Project Requirements Document you created from Week Two, create one detailed project plan in a work breakdown structure (WBS) format that presents at least five major activities and at least three tasks per major activity. This means you will have at least 15 tasks in your project plan. Your detailed WBS should be in tabular format, with all of the following columns:

• Activity name
• Name
• Percent Completion
• Start Date
• Finish Date
• Resource
• # Days Duration
• Precedent Task

Assignment 2: Using the Work Breakdown Structure (WBS) created in the Week Three assignment one, create a logical precedence diagramming method (PDM) network diagram. The specifications for the network diagram are as follows:

• Uses boxes, arrows, and task numbers from your WBS.

• Illustrates at least one series PDM relationship.

• Illustrates at least one parallel PDM relationship.

• Illustrates at least one start-to-start and one finish-to-finish PDM relationship.

Reference no: EM131017292

Questions Cloud

Find the mean median and standard deviation of data set : From the pressure data below, make a dot diagram. Mark the location of the mean and standard deviation. (You can use Excel or MATLAB to do this by plotting x-y data where all of the y points are 0. Minitab and R can also do this.)
Identify the strengths of the organization structure : Identify the (internal) strengths of the organization structure. Identify the (internal) weaknesses of the  organization structure. Identify the (external) opportunities
What applications might the scientific method : What applications might the Scientific Method have to daily life? Give an example.
Do they actually maintain a balance of power : Define federalism and discuss how it relates to national and state sovereignty. What are the similarities and differences between today's version of federalism and the federalism that was established in 1787
Create one detailed project plan in work breakdown structure : Based on the Project Requirements Document you created from Week Two, create one detailed project plan in a work breakdown structure (WBS) format that presents at least five major activities and at least three tasks per major activity
Propsoal about parallelized conjugate gradient : Prepare a research paper about parallelized conjugate gradient, you need to do propsoal about parallelized conjugate gradient
Vertigo is a medical term used to describe feeling dizz : Vertigo is a medical term used to describe feeling dizzy, as if everything is spinning. As it can severely compromise an individual's ability to walk or stand still properly, vertigo most likely indicates a problem with the person's
How long will it take for all 10 units : If the 3rd unit takes 141 hours and the 4th unit takes 136 hours, how long will it take for the 30th unit? How long will it take for all 30 units?
Determine the maximum amount of water that can flow : The amounts on the arcs represent the maximum daily amount sofwater that can flow across the network in thousand sofgallons. Determine the maximum amount of water that can flow through the system.

Reviews

Write a Review

Other Subject Questions & Answers

  Cross-cultural opportunities and conflicts in canada

Short Paper on Cross-cultural Opportunities and Conflicts in Canada.

  Sociology theory questions

Sociology are very fundamental in nature. Role strain and role constraint speak about the duties and responsibilities of the roles of people in society or in a group. A short theory about Darwin and Moths is also answered.

  A book review on unfaithful angels

This review will help the reader understand the social work profession through different concepts giving the glimpse of why the social work profession might have drifted away from its original purpose of serving the poor.

  Disorder paper: schizophrenia

Schizophrenia does not really have just one single cause. It is a possibility that this disorder could be inherited but not all doctors are sure.

  Individual assignment: two models handout and rubric

Individual Assignment : Two Models Handout and Rubric,    This paper will allow you to understand and evaluate two vastly different organizational models and to effectively communicate their differences.

  Developing strategic intent for toyota

The following report includes the description about the organization, its strategies, industry analysis in which it operates and its position in the industry.

  Gasoline powered passenger vehicles

In this study, we examine how gasoline price volatility and income of the consumers impacts consumer's demand for gasoline.

  An aspect of poverty in canada

Economics thesis undergrad 4th year paper to write. it should be about 22 pages in length, literature review, economic analysis and then data or cost benefit analysis.

  Ngn customer satisfaction qos indicator for 3g services

The paper aims to highlight the global trends in countries and regions where 3G has already been introduced and propose an implementation plan to the telecom operators of developing countries.

  Prepare a power point presentation

Prepare the power point presentation for the case: Santa Fe Independent School District

  Information literacy is important in this environment

Information literacy is critically important in this contemporary environment

  Associative property of multiplication

Write a definition for associative property of multiplication.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd