Reference no: EM131227324
Construction Management Assignment -
We're going to build an extension to existing building, shown in Fig 1 to 4.
Fig 5 shows the expansion plans.
1. I want you to create a sequence list of 30 activities that will be required to complete the work. For example asphalt demolition.
Consider tasks that have to do with: Demolition, Site utilities, Roofing, Masonry, Carpentry, Steel erection, Doors, frames and windows, etc.
2. Determine exactly the manpower, equipment, and material required for each task.
3. Sequence the tasks to obtain the greatest efficiency.
- Minimize material handling
- Minimize traveling for both labor and equipment
- Keep equipment constantly in motion
So you have to provide a thorough analysis with the 30 activities required to complete the task and describe how it can be done in a safe manner, and then complete the table below for the 25 activities.
Activity
|
Crew
|
Equipment
|
Material
|
Notes (if needed)
|
|
|
|
|
|
Attachment:- Assignment.rar
Provide a rationale for two change strategies
: Propose and provide a rationale for two change strategies to address the agency's performance. Propose two methods of performance measures for the department to meet within six months.
|
Difference between usa and brazil
: How do you explain the difference between USA and Brazil in terms of foreign cement producers market shares? Is your explanation consistent to your answer about evidence of collusion in Brazil?
|
A brief discussion of the research study focus
: A brief discussion of the applicability of the research study's key findings to current and future practices in the field of criminal justice. You may use your direct experience, information from the textbook, and/or information from additional so..
|
How much should investors be willing to pay for these bonds
: Valuing a Zero-Coupon Bond Assume the following information for existing zero-coupon bonds: - How much should investors be willing to pay for these bonds?
|
Create a sequence list of activities that will be required
: I want you to create a sequence list of 30 activities that will be required to complete the work. For example asphalt demolition. Consider tasks that have to do with: Demolition, Site utilities, Roofing, Masonry, Carpentry, Steel erection, Doors, f..
|
Analyze the reasons for and practice of recruiting
: Using your selected agency, analyze the reasons for and practice of recruiting and hiring a qualified workforce. Provide at least two reasons and examples to support your position.
|
What is the marginal utility of x and y
: a. What is the marginal utility of X and Y? b. What is the MRSxy? c. Draw a sample indifference curve
|
What is the present value of the bond
: What is the present value of the bond? - If the required rate of return by investors were 14 percent instead of 11 percent, what would be the present value of the bond?
|
Should unsuccessful attempts to commit a crime be punished
: Explain the sense in which criminal penalties are "prices" designed to elicit the "efficient" level of crime.
|