Assignment related to work breakdown structure

Assignment Help Web Project
Reference no: EM13724086

Assignment:

VoIP Part 1 (Work Breakdown Structure)

This assignment contains two (2) deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file.

As the project manager for an IT department, you have been assigned to manage the project of deploying a new VoIP phone system to the company's campus. The campus consists of three (3) different buildings, each with twenty to fifty (20 to 50) workstations. The project must be completed in ninety (90) calendar days starting on November 1.

Deliverable 1: Summary (MS Word or open source equivalent)

Question 1: Write a one to two (1-2) page summary document in which you:

a. Summarize the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.).

b. Define a work breakdown structure and describe the methodology behind constructing one.

Deliverable 2: WBS (MS Project or open source equivalent)

Question 2: Use Microsoft Project to create a WBS which:

a. Contains at least five (5) main tasks, one for each of the PMBOKR process areas.

b. Contains at least sixty (60) line items distributed in ten (10) or more work packages.

c. Contains Work Breakdown Structure Code for each task.

d. Presents a duration estimate for each task which results in a duration estimate for the project not to exceed the requirements described in the overview.

Deliverable one (1) of your assignment must follow these formatting requirements:

  • Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
  • Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

--------------------------------------

The solution file contains Deliverable 1.docx file for Deliverable one part which includes total 558 Words count including the references and a Project1.mpp file which is complete solution for Question 2 (Use Microsoft Project to create a WBS)

Verified Expert

Reference no: EM13724086

Write, test and debug javascript for the problems

Write, test and debug (if necessary JavaScript for the problems that follow- When required to write a function, you must include a script to test the function with at least tw

Create a new web application that displays a form

Create a new Web application titled Week8. Next, create a JSP that displays a form when the doGet method is invoked. The form will contain a post action that directs the for

Prepare a html page using html tags

All the pages/code must include: detailed comments explaining what you have done for anyone to follow, a header and logo and a footer with copyright, date, and email informati

Define website content requirements

Although you will learn that Content Inventory and Categorisation and Labelling are part of the design phase, this work has already been partially done for you. Below you wi

Demonstrate effective use of the basic html5 and css3 code

Demonstrate effective use of the basic HTML5 and CSS3 code discussed in chapters 2 - 7, and implement the elements and principles of visual design reviewed in the course.

List the wordpress components and features you used

List the WordPress components and features you used in the development of the prototype. Describe the components and features you plan to include in the final product (should

Develop an application that display the total domestic sales

The sales manager at Conway Enterprises wants an application that she can use to display the total domestic, total international, and total company sales made during a six-m

Develop a visual rendering depicting your design

Develop a visual rendering depicting your design through the use of Microsoft Visio or its open source alternative, Dia. Note: The graphically depicted solution is not include

Reviews

Write a Review

 
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd