An electrical machine whose power consumption is 2.0kW requires the use of a 250meter extension cord. Determine the AWG size of the extension cord needed to supply electricity from a 120 volt source. The resistance per 304.8 m of copper wire uses in the extension cord of AWG 14,12,10,8 and 6 are 2.58,1.62, 1.02, 0.64 and 0.41 respectively. Assume a 2% allowable voltage drop. Show all working .
What is the requirement for the phase response (transfer function) of each of these links to avoid distortion of the transmitted waveform?
A chest radiograph of 43cm x 35cm is to be viewed on a v monitor wih a resolution of 3 lp/mm. what minimal bandwidth is necessary for the monitor if the image is displayed at 60Hz non-interlaced
Consider the financial aspects of the digital thermometer project. The project cost is estimated at $10,000. The total manufacturing cost of the digital thermometer, as called for in the specifications, total $150(that is, $95 parts
A fluorescent tube fixture takes 1 ampere when connected to a 120-volt source. A wattmeter in the circuit reads 80 watts. What is the' operating power factor of this unit
Two input capture events occur at counts 0xBA47 (first event) and 0x42B3 (second event) of the free-running counter. How many counts have transpired between these two events
a) Make a table showing each load and its complex power. b) Determine the total complex power and the overall power factor. c) Determine the magnitude of the total current supplied by the 600V source.
A 10kW 220-V single-phase motor is operating at 0.7 lagging power factor. Find the value of the capacitor that needs to be connected in parallel with the motor , if the power factor is to be improved to 0.95 lagging.
What determines overflow when adding or subtacting 2scomplement numbers HOw can overflow be detected
Three amplifiers with power gains of 15, 22, and 7 are cascaded. The input power is 120 µW. What is the output power of the final amplifier stage
A certain oil filled 100 MVA three phase transformer is rated at 345 kV / 25 kV, 75 degree C temperature rise, FOA, 60 Hz, connected delta / grounded wye. The equivalent circuit of the transformer has leakage impedance of Z
designing a digital thermometer, which will display temperatures from -60 degrees F tp +140 degrees F. (thesystem displays the temperature to the nearest degree, so you will not need to display fractions of a degree.
Increasing the number of SIMD processors to 15 (assume this change doesn't affect any other performance metrics and that the code scales to the additional processors)
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd