Assignment Document

2- Review the linking of the levels of the project levels

Pages:

Preview:


  • "2- Review the linking of the levels of the project levels of the surrounding streets, as well as services andfacilities on those streets.3 - Review the work of a framework to fix the axes around the building to be created, taking into account notto ..

Preview Container:


  • "2- Review the linking of the levels of the project levels of the surrounding streets, as well as services andfacilities on those streets.3 - Review the work of a framework to fix the axes around the building to be created, taking into account notto remove the frame until the foundations and ground columns are casted.4 - Review the installation of axes on the frame according to the plans.- Excavationworks:1-Reviewing the signing of the rules and regulations and any other works that require digging andadopting the dimensions of the drilling.2-Giving the contractor permission to excavate.3-Receiving the excavation work according to the dimensions and levels contained in the drawings.? Foundation works:- Ordinary concrete:1- Review and approve the design of the concrete mix according to specifications.2- To give the contractor permission to cast according to the form prepared for this purpose.3 - Supervision of the process of casting and verification of (textures - mechanical shaking - surface finish).4 - Verification of the processing of concrete according to specifications and duration.5 - Verify the isolation of the surface of ordinary concrete (if any).- Reinforced concrete:1 - Revision of the signing of the columns.2. Review the strengths of the armed bases and their conformity with the axes and dimensions according to the plans,and review the strengthening and strengthening of the wrenches.3 - Revision of reinforcing steel for the foundations of armed according to the specifications.4 - Review the status of steel wire shafts for column control and retaining walls according to the axes and dimensionsin the drawings. 5 - Review the cleanliness of the surface of the concrete and the presence of concrete cover.6 - Review the thickness of the concrete cover.7. Review and approve the design of the reinforced concrete mix.8 - Authorization to the contractor to cast according to the model prepared for that.9 - Supervision of the process of casting and verification of the textures, mechanical shaking, concrete cover, surfacefinish, samples and tests, taking into account the not casting at intervals.10 -Taking into account the disassembly of the wrenches after the times specified according to the specifications, andcheck the absence of defects in the cast elements.11 - Verification of concrete treatment for the period specified in accordance with the specifications.12- Verify the insulation of foundations against moisture.- Flooring works:1. Verification of levellingof the ground after the backfill, and verification of the levels and paths of extensions forsanitary and electrical works according to the plans.2. Treatment against termites when required to do so.3 - Review the reinforcement of the floors (light reinforcement net) and determine the thickness of the castingaccording to the plans.4- To give the contractor permission to cast according to the form prepared for that purpose.5 - Supervision of the process of casting floors and check: textures, mechanical shaking, concrete cover, surface finish,samples and tests, taking into account the not casting at intervals.6 - Verification of concrete treatment for the period specified in accordance with the specifications.7 - Review the insulation of the flooring against moisture materials approved.8 - Ensure the layer of insulation.9 - Perform tests for different extensions before insulation and laying floors. 10 - Revision of irrigation network extensions and tests before pouring outdoor floors.- Columns and concrete walls:1 - Revision of the reinforcement of columns and walls according to the specifications.2 - Review and receipt of wrenches for columns and walls (axes - dimensions - vertical - strengthening andstrengthening - the level of casting).3- Adopting the concrete mix and giving the contractor permission to cast.4 - Supervision of the process of casting and verification of: textures, mechanical shaking, concrete cover, surfacefinish, samples and tests, taking into account the not casting at intervals.5 - Taking into account not to cast from high elevations to avoid separating the components of concrete.6 - Verification of concrete treatment for the period specified in accordance with the specifications.7 - Taking into account the disassembly of the wrenches after the times specified in accordance with the specifications,and check the absence of defects in the cast elements.- Ceilings and beams:1 - Review and receipt of wrenches for the roofs (dimensions - levels - strengthening and reinforcement _ ducts forelectrical, sanitary and mechanical works).2 - Review and receipt of reinforcement according to specification.3 - Take in the roofs of the Hurdi review and receipt of blocks and the dimensions of the dimensions of nerves andbeams.4- Adopting the concrete mix and giving the contractor permission to cast.5 - Supervision of the process of casting and verification of: textures, mechanical shaking, concrete cover, surfacefinish, samples and tests, taking into account the not casting at intervals.6 - Verification of concrete treatment for the period specified in accordance with the specifications. "

Why US?

Because we aim to spread high-quality education or digital products, thus our services are used worldwide.
Few Reasons to Build Trust with Students.

128+

Countries

24x7

Hours of Working

89.2 %

Customer Retention

9521+

Experts Team

7+

Years of Business

9,67,789 +

Solved Problems

Search Solved Classroom Assignments & Textbook Solutions

A huge collection of quality study resources. More than 18,98,789 solved problems, classroom assignments, textbooks solutions.

Scroll to Top