Why the project you identified can be classified as project

Assignment Help Project Management
Reference no: EM131371687

Assignment: PROJECT MANAGEMENT IN ENGINEERING

Instruction: This is an individual, take home exam. Read carefully all questions before providing an answer. Your response must be the result of your individual work and be presented in a scholarly manner. I want concise, detailed responses. Edit your responses to achieve economy of words, but depth of analysis. Use APA styles for in text citation and referencing. Your work will be evaluated based on your demonstrated understanding of the materials that we covered in this class. Academic dishonesty will not be tolerated and disciplinary action will ensue.

Pick one movie from this list:

• Beauty and the Beast (1991)

• Chicago (2002)

• Dreamgirls (2006)

• Hairspray (2007)

• Mamma Mia! (2008)

• Mary Poppins (1964)

• Moulin Rouge! (2001)

• My Fair Lady (1964)

• Singin' in the Rain (1952)

• The Phantom of the Opera (2004)

• The Sound of Music (1965)

• The Wizard of Oz (1939)

You are responsible to locate the movie you wish to use for your analysis.

Memo I

Memo is limited to one-page, single spacing, 12-point font. In your Memo I, include the following information:

1. Movie name

2. One project from the movie that you will be analyzing

3. Project manager for the project you identified

4. Project team members for the project you identified

5. Justify why the project you identified from the movie can be classified as a project.

Note: Choose your movie and project wisely. Once approved by the instructor, your project selection cannot be changed, and your midterm exam and final exam will be based on the project you identified in this memo.

Clearly state the movie selected, project identified, and the project manager in your cover page.

Answer the following questions.

1. Was the project manager effective? Why or why not?

Note: Base your analysis on at least two external, reputable, and scholarly sources (blog, Wikipedia, content collection sites are not acceptable). You may use your textbook, but it will not count as a source.

2. Was the project team effective? Why or why not?

Note: Base your analysis on at least two external, reputable, and scholarly sources (blog, Wikipedia, content collection sites are not acceptable). You may use your textbook, but it will not count as a source.

3. From the sociocultural dimension of project management, identify two areas of opportunity and provide specific recommendations for improvement.

4. From the technical dimension of project management, identify two areas of opportunity and provide specific recommendations for improvement.

Style and formatting: Single spacing, 12 pt font, maximum 350 words per question. Include your word count for each question.

Reference no: EM131371687

Questions Cloud

What is the function of the file of a sequencer : What output and step programming limits may be placed on sequencer instructions?
Describe the operation of a drum switch : Explain the transfer of data that occurs as the sequencer is advanced through its various steps.
Write a response about the given post : You are a staff member in a before/after school program at a local community center. When working with a 5-year-old girl in the program, you discover that she has a cast on her foot and that both of her legs and arms are covered in bruises, which..
Outline a method of carrying out this test : Assume that prior to putting a PLC system into operation, you want to verify that each output device is connected to the correct output terminal and that the output module or point is functioning properly. Outline a method of carrying out this tes..
Why the project you identified can be classified as project : IE 471/571- Justify why the project you identified from the movie can be classified as a project. Clearly state the movie selected, project identified, and the project manager in your cover page.
Write the research based business report : WRTG 393- The paper is a research-based business report.  Providing background research to an audience to help the audience make a decision on a topic.
Compare the uses for rslogix and rslinx programming software : The same address is used for two coil instructions within the same PLC program. What will happen as a consequence of this?
Define the term objective in objective method of personality : In this assignment, you will compare projective and objective methods of personality assessment. Research a minimum of three peer-reviewed articles in the Ashford University Library that were published within the last 15 years on these techniques...
What information is provided by the cross reference function : List five preventive maintenance tasks that should be carried out on the PLC installation regularly.

Reviews

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd