..zero energy building, Civil Engineering

this is our final year project .please help me to guide about it
Posted Date: 10/1/2012 2:40:43 PM | Location : United States







Related Discussions:- ..zero energy building, Assignment Help, Ask Question on ..zero energy building, Get Answer, Expert's Help, ..zero energy building Discussions

Write discussion on ..zero energy building
Your posts are moderated
Related Questions
Find the Cumulative Distribution Function: Find the cdf of Y = Z 2 where Z - N (0,l) Solution: F(y)= P(Y ≤ y) = p(z 2 ≤y) = P(-√y≤ √z≤√y) = ?(√y)- ?(-√y) = ?(√y)

I have assignment for hydraulics can you help for that

GIVE IN DETAIL THE TREATMENT OF TOP SURFACE OF EARTH FILLING..

show the diagram for non coplanar non concurrent force system

ADVANTAGE OF FLEMISH BOND

1. Domes - You are a construction manager in the UAE in charge of a project that involves constructing domes.  Discuss briefly, giving examples, a range of different types of dome

A soil has a plastic limit of 25% and a plasticity index of 30. If the natural water content of the soil is 34%, what is the liquidity index and what is the consistency index? H

Emulsion: An emulsion is a bituminous binder which is in a fluid form at atmospheric temperatures above O o C and requires no heating at all. Bitumen cab be converted to an e

The plan of a proposed spoil heap is shown in Fig. The heap will stand on a thick deposit of soft clay with E-value 15 MN/m 2 . The uniform pressure on the soil may be suppose as 1

Gravity flow is fluid flowing because of the forces of gravity alone and not to an applied pressure head. In the Bernoulli equation, the pressure term is omitted, and the height an