Writing of a welding procedure specification (wps), Mechanical Engineering

Writing of a Welding Procedure specification (WPS)

A typical working procedure specification is written with all the factors of production in mind. Both experience and latest technological awareness help to write an acceptable or successful WPS. The WPS is a list of the following welding variables with the proper values of these entered accordingly.

  1. Welding process
  2. Base metal
  3. Joint design
  4. Filler metal
  5. Position
  6. Preheat / inter pass / post heat
  7. Electrical characteristics
  8. Post weld heat treatment
  9. Gas(es)
  10. Techniques (stringer I weave bead transfer mode, orifice dia, etc.)
Posted Date: 9/18/2012 1:26:10 AM | Location : United States







Related Discussions:- Writing of a welding procedure specification (wps), Assignment Help, Ask Question on Writing of a welding procedure specification (wps), Get Answer, Expert's Help, Writing of a welding procedure specification (wps) Discussions

Write discussion on Writing of a welding procedure specification (wps)
Your posts are moderated
Related Questions
pin shift return spring : Check pin shift return spring for proper torque.

Polygon law of forces

a) Define Economics Order Quantity. Derive, using neat diagram, the mathematical formula for economic order quantity. b) The purchase manager of an industrial unit is placing on

What is carbonation.? Discuss its stability s mathod of formation

State and define the bending equation and mention it''s units and derive it

Q. Explain about water De-Oiling process? The De-Oiling process consists of three major components: The Surge and Skim Tank which reduces PW oil content to 100 ppm I

What are the objectives of bearing capacity? The objectives of bearing capacity: a. identify the possible modes of failure that a shallow foundation can undergo, b. under

Roller Spot Welding In this process, a series of intermittent spot welds are made using wheels or rollers as electrodes. The rollers are power driven and are stopped while ind

when does the cyclic service apply for pressure vessels in batch plant (operation)

Temporary Stone Scuppers: In hill roads, it is customary to cut the roads from the hill-face and to open up the road immediately thereafter to traffic. Further improvements s