Write short note on skv process of thermit welding, Civil Engineering

Q. Write short note on SKV  process of thermit welding?

This term is used for welding by Alumino thermic process with short preheat time. The time required for preheat with petrol and air is only 10 minutes. The principal merit of SKV process is that, time required for preheat is reduced from 30-45 minutes for ordinary thermit welding to only 10 minutes, there by reducing the block time requirements and ensuring a better quality of preheat. The process will employ prefabricated moulds, there by ensuring a better quality of weld collar.

Posted Date: 6/26/2013 3:21:21 AM | Location : United States







Related Discussions:- Write short note on skv process of thermit welding, Assignment Help, Ask Question on Write short note on skv process of thermit welding, Get Answer, Expert's Help, Write short note on skv process of thermit welding Discussions

Write discussion on Write short note on skv process of thermit welding
Your posts are moderated
Related Questions

Q. Underwater problems in bridge construction? The major bridge construction materials are steel and concrete. In the past, stone and brick masonry, with lime mortar as binding

DOCKS: Types of Docks Docks are artificial enclosures for the reception of ships. Three types of docks are found : (a)        Harbour Docks, or Wet Docks, which ar


Q. What is Multiple-cell box girder? Multiple-cell box girder: cells connected by top flanges vs. cells connected both by top and bottom flanges When the depth of a box gi

Q. What are the various impurities in water? Ans.- Impurities in water - The impurities in water are classified as - i. Suspended Impurities. ii. Colloidal Impuritie

Q. Show the Design of Howe truss? Design of Howe truss is the opposite to that of Pratt truss in that the diagonal members are slanted in the direction opposite to that of Prat

Q. Explain Remote sensing technique? Remote sensing is a science or an art of obtaining the information about an object, area or a phenomenon through analysis of data acquired

Assignment:-Continuous Prestressed Concrete Beam Design A cast in-place 3-span prestressed concrete T-beam is to be designed. The T-beam concsists of an 8-in thick reinforced

construction detail of all types of flooring