Q. Who is a stake holder for a software project?
[Stake holder :- something or somebody with direct interest: a group or person with a direct interest, investment or involvement in something, e.g. the employees and customers of a business concern]
Ans) A stakeholder will be a project team member, an employee of the user organization, or a senior manager. It will be virtually anyone, as long as that person has something to do with the project.
Explain about the incremental model. Have similar phases as the waterfall model. Phases are Analysis. Design. Code. Test. Incremental model delivers
Perform analysis and design of the Vehicle Control Unit software using UML, and document all results obtained from each of the following tasks: 1. Requirements analysis including:
Justify the term "Software is engineered" Software is engineered not manufactured. Although some similarities exist between software development and hardware manufacture, the t
What is meant by Throw away Prototyping? Giving the user a system which is incomplete and then changing and augmenting it as the user requires become clear. The objective
What is cyclomatic complexity? Cyclomatic complexity is software metric that gives the quantitative measure of logical complexity of the program. The Cyclomatic complexity e
Explain Control Structure Testing Ans) Due to basis path testing alone is insufficient, other methods should be utilized. Condition testing can be utilized to design test cas
What are the virtues of incremental model? i. The incremental model can be adopted when there are less number of persons associated with the project. ii. Technical risks can
How can we know about to divide numbers from total error from which half passed through error and half passed to amplified and how to generate defect efficiency?
An application which is under development. How would you develop a test case for it? When application is under development, Business Requirement Document is used as primary doc
List the process maturity levels in SEIs CMM. Level 1: Initial - Few processes are explained and individual efforts are taken. Level 2:Repeatable - To track cost schedule an
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd