What is the meaning of context-awareness, Other Engineering

Question :

(a) The Guide project has been developed to provide city visitors with a hand-held context-aware tourist guide.

(i) In this case, what is the meaning of context-awareness?

(ii) What were the main steps involved in this project?

(b) Prior to developing the guide, 4 key requirements were identified. List and describe each of these requirements.

(c) Although Wavelan has a propagation range of 200m, due to very poor propagation characteristic only small assymetric cells were obtainable. However this had two consequential advantages for the project. State and describe both of these advantages.

(d) Describe the six steps that illustrate how the various objects in the Guide architecture react to a change in the visitor's current location.

Posted Date: 12/3/2013 4:55:13 AM | Location : United States







Related Discussions:- What is the meaning of context-awareness, Assignment Help, Ask Question on What is the meaning of context-awareness, Get Answer, Expert's Help, What is the meaning of context-awareness Discussions

Write discussion on What is the meaning of context-awareness
Your posts are moderated
Related Questions

Assume that a movie is two hours long, that the frame rate is 30 frames per second, and that the resolution per frame is 1080i (1920×1080 pixels per frame), and that each pixel is

Depreciation Calculation Two most popular methods of charging depreciation are: straight line and diminishing balance or written-down value (WDV) methods. For reporting to the sha


A diffraction grating is an optical element that diffracts light into its constituent wavelength (colors). It is an excellent device used in laboratory to study the spectra. Co

derive the power in case of r-l circuit

Write a program to calculate from the infinite series: Print a table showing the value of approximated by one term, two terms, three terms, four terms, and so on from th

Ask questioy 4 men #Minimum 100 words accepted#

Matrices for risk analysis: NFPA 551 describes a technique of using matrices for risk analysis.  Such matrices are quite commonly used in the UK for assessing risk but, fortun

I am not getting proper infrared receiver for my mini project so help for finding proper ir receiver..