Question
If contractor is likely for defective works for 12 years with pact under seal, then what is meaning of Maintenance Period?
Answer Faulty works constitute a breach of contract in accordance with Limitation Ordinance. An action founded on easy contract shall not be brought after expiration of 6 years as an action founded with contract under seal shall not be brought after finishing of 12 years. For construction works, date of counting these deeds should bethe date of substantial completion. To react above question, one ought to note that under contractual requirement, contractor during Maintenance Period has right to rectify defects and employer has also right to request contractor to make good malfunctioning work. Still, after expiry of Maintenance Period, in case of a few arising of defects, employer has to employ others to rectify these works and carry action to court to claim contractor for costs connected.
classification of lintel
The objective of this module is:- For the student to identify the track design issues and there relationships that will need to be considered in the development of a feasibil
Sir, What is the dosage limit of densifier for SFRC concrete
TYPES OF OBSTACLES IN CHAIN SURVEYING
explain about single reinforced beams?
lehmans method
Q. Butt weld – from one side vs from both sides? In the design of butt weld strength, it's normally presumed that its strength is at least equivalent to parent metal. To improv
Explain Energy Grade Line (EGL) Graph of the sum of the potential, pressure and kinetic energies along a pipe or open channel. Energies are plotted along the y-axis above a dat
criteria for economical span length in bridge
Significance of tailwater level in culverts Headwater level and tailwater level of culverts are significant parameters in hydraulic design. Headwater level can't be set too la
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd