According to National Building Code (Sp:7 1970), the differential settlement shall be kept within the limits to which the superstructure can accommodate itself without harmful distortion, by suitably designing the foundation. Total settlement shall be so restricted or special arrangements made so that connections to the buildings such as drainage lines are not damaged. Allowable bearing pressure for footings on sand should be such that differential settlement does not exceed 1/300. This condition is generally satisfied if the total settlement is limited to 50 rnrn. For simple spread footings on clayey soils, the allowable bearing pressure should be such that the differential settlement does not exceed 1/300. This condition is generally satisfied if the total settlement is limited to 75 mrn.
what is the procedure for gsb proctor test for matrial sampling for lab density
#ques5. A rectangular channel is 3 m in width and draws water from a lake. The channel slope is 0.001 and the Manning’s n is 0.0013. What will be the discharge in the channel when
tension splice two plate
Q. What do you mean by Depth of Scour? The maximum scour depth in a stream can be ascertained when ever possible by actual sounding at or near the site proposed for the bridge
Question It should be necessary that raking piles of a bridge abutment be placed under an embankment ? Answer For a bridge abutment to be supported on raking piles with div
A raft, 8 m × 24 m, is founded at a depth of 4 m in sand with a value of N = 20 up to great depth. Illustrate the total load which the raft can support? What will be the total c
Determine the total head and total pressure of water flowing at in a pipe which has the following data: Flow= 2,500 gpm; Elevation = 30 ft; Pressure = 40 psi; Pipe Diameter =
Physical Tests on Cement (a) Soundness Test: by sieve analysis, it is conducted. 100 gms of cement is taken and sieved throughout IS sieve No. 9 for fifteen minutes. Residue on
Q. What is Rapid Sand Filter? A Rapid Sand Filter is a water treatment plant that includes provision for pre treating the water by coagulation and sedimentation for settlement
Question What is the reason that shallow bedrock condition adverse for open berth piers? Answer Most severe load on piers generally is horizontal load due to berthing
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd