Welder performance qualifications, Mechanical Engineering

WELDER PERFORMANCE QUALIFICATIONS


Requirement of Welder Qualification

In performance qualification, the basic attempt is to establish the ability of the welder to deposit sound metal. In case of welding operator qualification it is his mechanical ability to operate the welding machine that is tested and acknowledged.

During welder's qualification, only the essential variables (as applicable to welder's skill) are considered and production welds with such altered variables should not be continued without additionally qualifying the welders. A welding machine operator usually gets qualified along with procedure test. Additional qualifications are to be suitably enforced as and when certain essential variables are not meeting.

Codes for Performance Qualifications and Acceptance of Defects


A large number of industrial codes now a days recognise prequalified welding procedures as t he manufacturing firms are able to produce the documentary evidence for such procedures as in vogue in their organisations. The selection, training and qualification of welders are the next few steps. Some of the popular codes to look for, at this juncture are:

  • Indian Boiler Regulations - IBR
  • ASME Boiler and Pressure Vessel Code - Section IX (Welding, Brazing & Soldering Qualifications)
  • DIN 8560 - (Testing of Welders)
  • BS 4872 - (Approval Testing of Welders when welding procedure approval is not required.
  • ISO
  • EN

 


There are also number of other specifications for welder testing, pertaining to individual codes of construction. A welder's plate test coupon can be maximum 300 mm x 400 mm with appropriate thickness to cover the allowed, specified thickness ranges. Similarly 2 pipes (or tubes) having a maximum of 125 mm length each are joined together for a pipe weld test coupon.

The test coupons are then subjected to radiography testing. Welders are outrightly failed for the following indications in the radiographic film. All other defects are acceptable within limits.

1. Severe root porosites / blow holes
2. Cluster of porosites
3. Cracks
4. Lack of fusion / incomplete penetration

After necessary post weld heat treatment the plates or pipes are marked, stamped, cut and machined into mechanical test specimens. Though, the requirements of the codes are slightly varied, 2 face bend tests and 2 root bend t ests alone are conducted for performance qualifications. In lieu of the above a radiographic evaluation is done.

Posted Date: 9/18/2012 1:45:45 AM | Location : United States







Related Discussions:- Welder performance qualifications, Assignment Help, Ask Question on Welder performance qualifications, Get Answer, Expert's Help, Welder performance qualifications Discussions

Write discussion on Welder performance qualifications
Your posts are moderated
Related Questions

Transformer Type Power Sources These are the simplest and cheapest type available for arc welding. These are the mainly used for SMAW, AC SAW and gouging applications. These are

Question: A series resistive inductive load is energised from a 240V (RMS), 50Hz single phase AC supply, such that the load draws 1200W at a power factor of 0.8. a) Calculat

Cell Control And Modeling   Various numbers of modeling systems and cell control have been developed to date. Researchers have worked many on three broad regions: scheduling;


Q. Plastic part manufacturing process? Plastic belongs to the family of organic materials. Organic materials are those materials which derived directly from carbon. They consis

why we feel increase in weight when elevator goes up?

Consider a simple single machine system. It consists of workpieces that enter the system, wait their turn to be processed on a single machine, and then depart the system. The workp

Feces Collection: Small aliquots of feces are frequently analyzed to detect the presence of "hidden" blood, so called occult blood, which is recognized as one of the most ef

Illustrate how the efficiency of Rankine Cycle can be improved by the use of Regenerative and Reheat heating. (b) During a test on boiler trial the following data were obtained