Void ratio and dry density of a soil, Civil Engineering

Assignment Help:

Q. Define water content, void ratio and dry density of a soil. If wet density of a soil is 1.9 gm per cm at a moisture content of 24%, what will be its dry density?

 Ans.- Water Content - The water content w also called the moisture content is defined as the ratio of weight of water ww to the weight of solids wd in a given mass of soil.

              w = ww  / wd  x 100

            The water content is generally expressed as a percentage.

Void ratio - Void ratio e of a given soil sample is the ratio of the volume of voids to the volume of soil solids in the given soil mass.

            Thus   e = vv / vs  ,    vv  = Volume of voids.  vs = Volume of soil solids.

Dry Density - The dry density γd  or the dry unit weight is the weight of solids per unit of total volume ( Prior to drying ) of the soil mass.

                 gd  = Wd / V.   or γd   = g / (1 + w)

Solution :  Given -  Wet density of a soil γ  = 1.9 gm /cm2  

                Moisture content w = 24% = 0.24

                 Dry density γd   = g / (1 + w) =  1.9 / 1 + 0.24 = 1.9 / 1.24 = 1.53 gm / cm Ans.


Related Discussions:- Void ratio and dry density of a soil

Determine the statements about unit area or borrow pit, Determine the State...

Determine the Statements about Unit Area or Borrow Pit? Ans: I.  Sometimes called Average Depth II. Works well for volumes for building sites and surface mines III. Needs

Levelling procedure, how to carry on leveling using dumpy level????????????...

how to carry on leveling using dumpy level????????????

Streams not wholly alluvial - alluvial streams, Streams Not Wholly Alluvial...

Streams Not Wholly Alluvial In streams which are not wholly alluvial, consisting of bed of pebbles, rock, etc. the liner waterway is kept equal to the actual surface width of

Estimation, What are the various methods of recording measurements? List fi...

What are the various methods of recording measurements? List five items each for various methods of recoding measurements?

Amount of water that added to achieve the optimum moisture, Geotechnical pr...

Geotechnical project specifications require that the soil's optimum moisture content of 24% be maintained during the roadbed's construction.   The field moisture test finds that fi

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd