Types of manufacturing system & layout, Operation Management

Types of Manufacturing System & Layout

A layout essentially refers to the arranging and grouping of machines which are meant to produce goods. Grouping is done on different lines. The choice of a particular line depends on several factors.

The method of grouping or the manufacturing system includes:

  1. Process bases layout functional layout or job shop layout,
  2. Product based layout line processing layout or flow line layout,
  3. Fixed position based layout or static layout,
  4. Cellular manufacturing (CM) layout or group Technology Layout,
  5. Combination based layout or hybrid layout.
Posted Date: 1/11/2013 7:23:23 AM | Location : United States







Related Discussions:- Types of manufacturing system & layout, Assignment Help, Ask Question on Types of manufacturing system & layout, Get Answer, Expert's Help, Types of manufacturing system & layout Discussions

Write discussion on Types of manufacturing system & layout
Your posts are moderated
Related Questions
Explain objectives of organisational development. Objectives of Organisational Development (i) Enhancement in the performance of the organisation. (ii) Enhancement in t

Discuss the advantages and risks of supplier co-location?

What are some practical limits to economies of scale?

A quality analyst wants to construct a sample mean chart for controlling a packaging process. He knows from past experience that the process standard deviation is two ounces. Each

Health care constant changes are a result of continuing trends in regulatio, policy, patient and provider advocacy efforts, as well as increasingly sophicated technology and indust

Suppose a new hospital is to be built to provide emergency medical healthcare service to 5 town w coordinates (5,6), (1,3), 13,7), (11,2), (18,1) on a map. The existing transportat

In a transportation problem, shipments from a dummy origin A Should be given a small cost to maximize their use B Should be given a large cost to prevent their use C Ar

Which section of the project charter signed by sponsor, project manager and core team members typically describes decision authority and the expected commitment for each of these k

a) Determine the value of the p-bar, the mean fraction defective. Then determine the control limits for the p-chart using 99.73% confidence level (3 standard deviations). Is this p

Champion v.Dunfee case a) What happened in this case as to why Champion the plaintiff is suing? b) Who did Dunfee try to bring into the case and why? c.) As to the girlfri