LINE BALANCING, Operation Management

Posted Date: 2/6/2013 6:18:51 AM | Location : USA

Assembly Line Balancing

Line Balancing and Work Cell Balancing is an efficient tool to increase the output of the Assembly line and Work Cell line to reduce manpower and cost. Assembly Line balancing is nothing though the Simple Line Balancing is the calculation of assigning works to workstation alongside an Assembly Line and that operation will be optima in sense. Henry Ford who was first introduced the Assembly Line Balancing and in early times it was simple line balancing (LB) that has optimized the industrial significance, the effective difference between the optimal and sub-optimal operation can afford savings that will be million dollars every year.

Singe-Model Assembly Line: in early times assembly lines were utilized in high level production of a single product. But now the products will draw customers with no any difference and allows the profitable use of Assembly Lines. An advanced technology of production which enables the automated setup of operations and it is negotiated time and money. One time the product is assembled in the same line and it won’t variant the setup or significant setup and it’s time that is utilized, this assembly system is called as Single Model Line.

LB: it is a Classical Operation Research (OR) which optimizes the problem, and it has been handled by OR for many decades. Several algorithms have been proposed to this problem and it contempt the usual importance of the issue and the OR utilizes to handle this. It’s commercial software which is available to optimize the industry and their lines.

Assembly Line Balancing is dependent upon 3 models and it is explained that these 3 types of models is related to Assembly Line Balancing and they are Single-Model Assembly lines, mixed models, and multi-model Assembly lines.

Multi-Model Assembly Line: in this type of model the uniformity of the assembled products and the production system is not that very much sufficient to accept the enabling of the product and the production levels. To decrease the time and money this assembly is arranged in batches, and this permits the short term lot-sizing issues which made in groups of the models to batches and the result will be on the assembly levels.

Mixed Model Assembly Line: in this model the setup time among the models would be decreased sufficiently and enough to be ignored. Thus this internal mixed model determines the assembled on the same line. And the type of assembly line wherein workers work in different models of a product in similar assembly line is called Mixed Assembly Line.
Posted by Aliena | Posted Date: 2/12/2013 7:31:33 AM

Related Discussions:- LINE BALANCING, Assignment Help, Ask Question on LINE BALANCING, Get Answer, Expert's Help, LINE BALANCING Discussions

Write discussion on LINE BALANCING
Your posts are moderated
Related Questions
Identify what HR mechanisms can be introduced in the international firm today to build a strategic business partnership, close the gap between management and employees while bui

How do you think management practices might change in response to increasing government regulation in the banking and health care industries?

Problem on ABC Analysis of Inventory: The ABC Analysis of Inventory divides inventory into three classes: Class A - high annual dollar volume Class B - medium annual doll

If charles lackey's utility costs remain constant at $500 per month, labor at $8 per hour, and cost of ingredients at $0.35 per loaf, but Charles does not purchase the blender sugg

In considering employee recruitment in your own business, what do you think is the best approach to use? Why do you think that is the best approach?

Base on the case study; United Photonics Malaysia Sdn Bhd Who do you think should manage the Laz-skan Development Project?

1) What are at least three factors that would motivate a company to set up a foreign operation? 2) What are the positive and negative impact of tariffs? Give a specific example

An assembly line with a number of tasks is to be balanced. The sum of the task times is 62 minutes. The line will operate for 6 hours per day. What is the minimum number of worksta

Tree Diagram of Activity Sampling Activity sampling is not restricted to the binary condition (working/not working); if the sample is large, additional useful information may