Cement Sand Plaster, Civil Engineering

How to use plaster cement in sand? 

Cement sand plaster is a layer of cement & sand mortar that is applied over walls made of brickwork, cement block work, RCC walls and RCC columns or beams.  

The plaster can be classified into 2 basic categories

1. Interior plaster as specified by interior designers is mainly smooth finish & 12mm thick (or can have rough keyed surface to receive other material like tile or stone cladding)

2. Exterior plaster that is applied on building facades, compound walls and others. is usually 24 mm thick & is applied in 2 coats of 12 mm each. The top coat is normally rough finish with a sand grain texture.

 

Posted Date: 7/4/2012 8:09:19 AM | Location : United States







Related Discussions:- Cement Sand Plaster, Assignment Help, Ask Question on Cement Sand Plaster, Get Answer, Expert's Help, Cement Sand Plaster Discussions

Write discussion on Cement Sand Plaster
Your posts are moderated
Related Questions
Theorem of three moments: You have been introduced to the analysis of one of the important class of structures, namely Statically Indeterminate Structures. You have been intro

individual wall methods benefits?

#ques5. A rectangular channel is 3 m in width and draws water from a lake. The channel slope is 0.001 and the Manning’s n is 0.0013. What will be the discharge in the channel when

Vertical Gradient: Vertical gradient can be of three types: Ruling Gradient Used as a matter of course. Limiting Gradient Used in situations where site condit

what is column

Classification of the damage according to the type of structures   The level of damage in spatial trusses has also been classified into three different levels based on the t

Determine the Statements about Unit Area or Borrow Pit? Ans: I.  Sometimes called Average Depth II. Works well for volumes for building sites and surface mines III. Needs


Question Have air test or water tests be selected to test leakage of constructed gravity pipelines ? Answer For gravity pipes, air tests are carried out after completi