TIMBER PILE, Civil Engineering

ADVANTAGE AND DISADVANTAGE OF TIMBER PILE
Posted Date: 3/3/2015 11:51:52 AM | Location : Malaysia







Related Discussions:- TIMBER PILE, Assignment Help, Ask Question on TIMBER PILE, Get Answer, Expert's Help, TIMBER PILE Discussions

Write discussion on TIMBER PILE
Your posts are moderated
Related Questions
Impact Test: Resistance of stones to impact is found by conducting tests in impacting testing machine .It contain of a frame with guides in which a metal hammer weighing 13.

The local survey crew measures a distance of 1,135 ft of new drainage pipe that is required for the new road construction. The beginning point for the drainage is located at statio

Q. What do you mean by Piston sampler? In sampling silts orclays, Piston sampler is lowered into boreholes and piston is locked at bottom of the sampler. This stops debris from

Q. Function of prime coat in bituminous pavement? The main function of prime coat in bituminous pavement is to protect the subgrade from weathering andmoisture. Because the pre

Question General requirement for Civil Engineering Works in 1992 Edition, Clause 15.09 details that tying wires for strengthening adjacent to and above Class F4 and F5 closes must

Explain the Hydraulic Radius (R) A fluid's cross-sectional area in flow divided by the wetted perimeter. For a circular channel flowing full and ½ full, R = D/4.


Q. Illustrate Concept of filter design? The material used for filter should satisfy the following normal criteria a. Filter material is more pervious than the base material


Illustrate the types of prestressing we can classify prestressing into two forms  : (a)  longitudinal prestressing, and (b)  circular prestressing.