Theodolote, Civil Engineering

List out the permanent adjustments of dumpy level.
Posted Date: 3/10/2013 9:16:41 AM | Location : Sri Lanka







Related Discussions:- Theodolote, Assignment Help, Ask Question on Theodolote, Get Answer, Expert's Help, Theodolote Discussions

Write discussion on Theodolote
Your posts are moderated
Related Questions
Design volume of the aeration basin - sewer construction: Problem: What is the design volume of the aeration basin? Solution Assuming that 30% of the plant influe

Geotechnical project specifications require that the soil's optimum moisture content of 24% be maintained during the roadbed's construction.   The field moisture test finds that fi

Explain Box jig? a) The box jig is so named because of its box shaped construction, closed from most of the sides. b) It is normally designed for those components having awk


Q. Illustrate Truss with K-bracing ? In the arrangement of triangulated framework in truss structures, it's more economical to design longer members as ties whereas shorter one

I am a Civil Engg student. Why CBR Values determined only at 2.5 and 5 mm penetration ?.

The head (energy) loss in the piping system between points 1 and 7 is the most nearly. Solution: 3 ft. The difference between point 1 and point 7 = 10 ƒt - 7 ƒt = 3 ƒt

Determine the loss of fluid energy as 310 gallons per minute (gpm) of water flows through 1,000 ft of 4 inch, schedule-40 welded and seamless steel pipe. The fluid temperature is 5

differences between highway pavement and airfield pavement

A County is planning to build a new roadway connector in the rapidly developing area of the county. The road can be built at a reduced capacity now for $30 million and can be widen