Techniques and resources in problem base learning, Electrical Engineering

Techniques and resources

Different techniques and resources were used in different areas of the problem during the course of the project.

The most important of them was the use of simulating package called proteus. The testing of a program and a circuit in physical was a tedious task. So proteus was for testing by simulating the design in it. It is really easier to redraw or modify a circuit and it has all the components required for the circuit construction.

If the circuit was soldered on a veroboard, it would have been time consuming and prone to faults. So the team thought of using the PCB as it was much easier. The circuit designs of the remote and the receiver were printed on a PCB and it helped save a lot of time as the whole circuit was soldered in a matter of minutes.

 

Posted Date: 3/25/2013 3:51:51 AM | Location : United States







Related Discussions:- Techniques and resources in problem base learning, Assignment Help, Ask Question on Techniques and resources in problem base learning, Get Answer, Expert's Help, Techniques and resources in problem base learning Discussions

Write discussion on Techniques and resources in problem base learning
Your posts are moderated
Related Questions

The spectrum analyser plots amplitude against frequency, in other words it shows signals in the frequency domain. The spectrum analyser has the same trigger options as the oscillos

Hi there i just asked for question and answer for 5 chapter and i just receive some of them in word the rest are in apiece of paper which is unprofessional could you please have l

Q. Digital demodulator processes? The functions of the receiver in Figure are the inverse of those in the transmitter. At the receiving end of a digital communication system, t

Q. The magnitude spectrum of a continuous  image is as given below.  a) Sketch the frequency response of the sampled spectrum if   ωs =1.5 ωm along x and 3ωm along  y directions

Role of Central and State Governments The subsequent roles of Central and State Governments are envisaged in the Act: The Central Government will Notify rules

The single-phase, 50-kVA, 2400:240-V, 60-Hz, two-winding distribution transformer is connected as a step-up autotransformer, as shown in Figure. Assume that the 240-V winding is pr

Q. A current of 65 A is measured with an analog ammeter having a probable error of ±0.5% of full scale of 100 A. Find the maximum probable percentage error in the measurement.


Defective Metering and Meter Reading Errors Defective Metering Tampered, slow running, stalled, damaged meters are a cause of huge losses to the utility. The electromecha