Systemic requirements - gis technology, Electrical Engineering

Systemic Requirements:

A robust GIS solution for a distribution utility comprises the subsequent:

  • GIS application and database software should be OGC (Open Geospatial Consortium) Compliant,
  • Differential GPS survey of entities and consumers and overlaying on satellite imagery should be on the subsequent scales:

1     Urban/Cities/Metros on 1:1000 scales.

2     Semi urban on 1:2500 scale

3    Rural area on 1:5000 scale (the survey in rural areas might be restricted to the corridor of HT/LT lines survey rather than covering whole rural area).

  • The map resolution should be as follows:

1    Spatial resolution less than or equal to 2.5 metre ground sample distance (GSD) per pixel for urban areas.

2    Spatial resolution less than or equal to 10 metre GSD per pixel for rural areas.

  • Door-to-door survey of customers and collection of data should be carried out.
  • Utility HQ/Circle HQ as Data Centre should be equipped along with servers and networked with Utility HQ, Divisions, Subdivisions, etc.
  • GIS System Testing and Commissioning should be completed for given concurrent users.

The utility must be ready for integrated IT enabling and the essential basic IT hardware and software involving networking must be in place.

Posted Date: 2/8/2013 6:44:11 AM | Location : United States







Related Discussions:- Systemic requirements - gis technology, Assignment Help, Ask Question on Systemic requirements - gis technology, Get Answer, Expert's Help, Systemic requirements - gis technology Discussions

Write discussion on Systemic requirements - gis technology
Your posts are moderated
Related Questions
Disconnection of Supply: An Appellate Tribunal has been created over the Commissions for speedy dispute resolution. It is assumed to adjudicate appeals against orders of the a

Q. Can you show the Decimal to Octal Conversion? To convert decimal to octal is somewhat more difficult. The usual method to convert from decimal to octal is repeated division

Mixed Mode Simulator: The circuit is preprocessed. The test points and waveform markers are located in input and output of the circuit. GND net is set like reference net.

The circuit shown below is a prototype 4 th - order low-pass filter which is required to meet the specification given. However the specification is not met due to inadequate atten

GIS APPLICATION IN THE POWER DISTRIBUTION ENVIRONMENT Previously, we have discussed the IT applications in the areas of Metering, Data Acquisition and Management, Asset Manage

Limitations: 1. Silicon transistors do not function at voltages much higher than about 1,000 volts (SiC devices can be worked as high as 3,000 volts). In difference, electron

You are given a binary image consisting of only zeros and ones, see image-A. Apply required morphological operations and give the output images on the grid.

Q. When the quantum step size δv and the step size of f (t) are the same as in , the quantizer is said to have a gain of unity. If, on the other hand, the quantizer has a gain of K

Consider an RLC series circuit excited by v (t) = 100√2 cos 10t V, with R = 20 , L = 1 H, and C = 0.1 F. Use the phasor method to find the steady-state response current in the cir

Consider a system described by the coupled difference equation y(k + 2) - ν(k) = 0 ν(k + 1) + y(k + 1) = u(k) where u(k) is the system input. (a) Find a state-variable