Systemic requirements - gis technology, Electrical Engineering

Systemic Requirements:

A robust GIS solution for a distribution utility comprises the subsequent:

  • GIS application and database software should be OGC (Open Geospatial Consortium) Compliant,
  • Differential GPS survey of entities and consumers and overlaying on satellite imagery should be on the subsequent scales:

1     Urban/Cities/Metros on 1:1000 scales.

2     Semi urban on 1:2500 scale

3    Rural area on 1:5000 scale (the survey in rural areas might be restricted to the corridor of HT/LT lines survey rather than covering whole rural area).

  • The map resolution should be as follows:

1    Spatial resolution less than or equal to 2.5 metre ground sample distance (GSD) per pixel for urban areas.

2    Spatial resolution less than or equal to 10 metre GSD per pixel for rural areas.

  • Door-to-door survey of customers and collection of data should be carried out.
  • Utility HQ/Circle HQ as Data Centre should be equipped along with servers and networked with Utility HQ, Divisions, Subdivisions, etc.
  • GIS System Testing and Commissioning should be completed for given concurrent users.

The utility must be ready for integrated IT enabling and the essential basic IT hardware and software involving networking must be in place.

Posted Date: 2/8/2013 6:44:11 AM | Location : United States

Related Discussions:- Systemic requirements - gis technology, Assignment Help, Ask Question on Systemic requirements - gis technology, Get Answer, Expert's Help, Systemic requirements - gis technology Discussions

Write discussion on Systemic requirements - gis technology
Your posts are moderated
Related Questions
Design a recycling MOD 19 up counter using JK FFs. In your design, include the logic circuit diagram and the timing diagram output that counts from 000002 = 010 to 100112 = 1910. C

Register to Register  This  instruction  is used to copy data from the  source  register to the destitution register. The  previous contents on the  destination register wil

What do you maent by Debugger? Debugger: This is a program that allows user to debug and test programs. All computers with microprocessor kits give debugging facility. To not

Prepayment Meters Usage of prepayment meters will extensively improve the revenue collection of the utilities. There are a number of ways in that prepayment assures revenue pr

Q. Schematic Diagram of LED based System ? As shown in the two schematic diagrams above, the LEDs in a seven-segment display are not isolated from each other. Rather, eith

Transmission Through a LiNb0 3 Plate Examine the transmission of an unpolarized He-Ne laser beam (?o= 633 nm) normally incident on a LiNb0 3 plate (ne = 2.29, no = 2.20) of thickn

a) A 230 V/25V, 50 HZ transformer with a rated primary current of 1,2 Amps is used to supply a number of 25 V, 30 Watt halogen light bulbs. Assuming an ideal transformer and tha

LC Filter To the load resistance R L the ripple factor is directly proportional in the inductor filter and inversely proportional to R L in the capacitor filter. Hence i

Aggregate Technical and Commercial Loss It is unfortunate in that addition to T&D losses, there is also a loss in revenue because of non-realisation of billed demand which lea