explain operations of direct and indirect leveling?
Posted Date: 3/26/2013 2:27:17 AM | Location : Ethiopia

Related Discussions:- surveying, Assignment Help, Ask Question on surveying, Get Answer, Expert's Help, surveying Discussions

Write discussion on surveying
Your posts are moderated
Related Questions

Joint filler in concrete expansion joints - a must?? Presence of joint filler is required to the proper functioning of concrete joints however some may doubt its value. For a c

Q. Show the Direction of gunning in shotcreting? At the time of the construction of shotcrete, it is intended at gunning the full thickness in one single operation and this hel

A footing foundation for a water tower carries a load of 9000 kN and is 3.6 metres square. It rests on dense sand of 9 m thickness overlying a clay layer of 3 metres depth. The cla

the distance between two pegs M and N is 7,063 as measured on a slope. the height measured on the pegs are that M=1.814M and N=0.5687M

1. What take place when float or slack of an activity is positive Ans: It represents a situation where extra resources are available and the completion of the project is not de

plz tell me the ratio of sand,aggregate,and tell me the mm of aggregate

A retaining wall 3.6 m high supports a dry cohesion less backfill with a plane ground surface sloping upwards at a surcharge angle of 20° from the top of the wall. The back of the

tack rivet figures with connections